Schaffner International
Maintenance Manual
Ecosine
®
Full Performance HV Line
– Frame Size Small
May 2018
16/19
3. Work instruction
– Dismantling process
Remove the 2 screws with a socket wrench
and a 5,5 mm socket and remove the cover
Disconnect all cables bridges from the
capacitors
Remove the cable tie, unscrew the nuts with a
combination wrench 18 mm and remove the
capacitors