Schaffner International
Maintenance Manual
Ecosine
®
Full Performance HV Line
– Frame Size Small
May 2018
9/19
2. Work instruction
– Dismantling process
Remove the 2 screws with a socket wrench
and a 5,5 mm socket and remove the cover
Remove the 4 screws with a socket wrench
and a 5,5 mm socket and open the fan
module
After removing the fan module, check the area
of pollution.
For cleaning use the brush and cleaning
paper with alcohol. Clean the fan area