10
5-3. Installation:
(1) Always
Keep proper footing & balance while moving this 208kgs
machine. And only use heavy-duty fiber belt to lift the machine as
per Fig. (C).
(2) Hang the machine up, away from the floor, take away the 4 pads
and assemble them on the auxiliary stand. Fix the machine on the
auxiliary stand and lock the connection nut.
(3)
Finish
removing this wooden case/crate from the machine. Unbolt
the machine from the crate bottom.
(4)
Position
& tighten 4 bolts into base holes properly after machine in
balance.
(5)
Turn off
the power before wiring & be sure machine is in proper
grounding. Overload & circuit breaker is recommended for safety
wiring.
(6)
Keep
machine always out from sun, dust, wet, raining area.
5-4. CLEANING & LURICATING
(1) Your machine has been coated with a heavy grease to protect it in shipping. This coating should be
completely removed before operating the machine. Commercial degreaser, kerosene or similar solvent
may be used to remove the grease from the machine but avoid getting solvent on belts or other rubber
parts.
(2) After cleaning, coat all bright work with a light lubricant. Lubricate all points. with a medium
consistency machine oil.
6.MINIMUM ROOM SPACE FOR MACHINE OPERATION
C Fig. C
1420 mm
600 mm
1250 mm