4/9
P100002807 A
1
1
2
3
4
B11648
Mounting the controller
Fig. 1
1
Wall Anchors
2
Pull on Plastic tab to release the printes circuit board
3
Flip printed circuit board to access mounting hole
4
Security Srew
Device Wiring
5
The EY-modulo4 Room Operating Unit can be wired in three (3) different ways depending on
its desired use:
Directly to a controller for use as a wall-mounted sensor.
•
Indirectly to a VAV through another sensor for VAV balancing.
•
Directly to a controller for use as a wall-mounted sensor and to provide access to the LON
•
®
network.