![SATO KEIRYOKI Sigma-II NS II-Q Quick Start Manual Download Page 6](http://html.mh-extra.com/html/sato-keiryoki/sigma-ii-ns-ii-q/sigma-ii-ns-ii-q_quick-start-manual_1201604006.webp)
−
5
−
2. Install 1-day chart for 1-day operation
1-day chart (400 sheets/box) may be purchased separately.
3. Install the recording cylinder
Confirm that the pinion is engaged properly with the gear as shown in
Fig. E.
●
Optional charts and cartridge pens
For No. 7210-00 and 7215-00 (range: −15 to 40
℃
, 0 to 100%rh)
No. 7210-60
1-day chart (400 sheets/box)
No. 7210-62
7-day chart (55 sheets/box)
(One box is a standard accessory)
No. 7210-64
32-day chart (55 sheets/box)
(Applicable for No. 7210-00 only)
For No. 7211-00 (range: −10 to 50
℃
, 0 to 100%rh)
No. 7211-60
1-day chart (400 sheets/box)
No. 7211-62
7-day chart (55 sheets/box)
(One box is a standard accessory)
No. 7211-64
32-day chart (55 sheets/box)
No. 7210-90
Cartridge pen (violet)
No. 7210-92
Cartridge pen (red)
For spring-wound model
●
Change cylinder speed pinion
Fig. E Side view of cylinder
Z: indicates number of pinion teeth
22 teeth (
φ
10.7mm) ..................................1-day operation
18 teeth (
φ
9.0mm) ....................................7-day operation
Fig. A Bottom of cylinder
Fig. B
1. Exchange 7-day pinion to 1-day pinion
・
Remove the 7-day pinion referring to Figs A and B
・
Remove the 1-day pinion from the holder on the base and store the 7-day
pinion on it. (Fig. C)
・
Install the 1-day pinion shaft marked ‘Z=24H’. Push the pinion straight onto the
shaft with thumb pressure until it stops. (Fig. D).
(Bottom view of cylinder that was removed
from the main shaft)
Cylinder holding nut
Main shaft
Pinion
Gear
Botton
for
7-day
operation
168H
Z=18
Chart holder
retaining hole
Lift on both sides
of pinion with tips
of screwdrivers
Pinion
Screw-
driver
Bottom of
cylinder
for
1-day
operation
Z=22
24H
Fig. C
Fig. D
gear for 1-day
operation
pinion
stops when a meets b.
a
b
pinion shaft