−
2
−
Mount recording cylinder
to the main shaft.
Attach cylinder holding
nut.
Supplementary explanation of usage
10.
11.
Cut tape that secures
upper pen arm.
12.
Remove the holding clip
that secures lower pen arm
by sliding it
upward.
13.
Remove cap for cartridge
pen by turning it counter-
clockwise.
14.
Push pen lifting lever away
from you until it stops.
Set time.
15.
16.
Put acrylic cover on.
17.
18.
Turn the carrying handle
clockwise until it stops.
to
secure the cover.
19.
1. Remove the acrylic cover and the packing materials that hold the mechanical
parts during transportation. (Photos No. 1 to 3)
2.
・
Quartz type: Insert batteries. (Photo No. 4-A)
・
Spring-wound type
: Raise up the thumbscrew at the top of the cylinder and turn it counter-
clockwise to wind spring. Be careful of winding too much. (Photo No. 4-B)
3. Attach chart (Photo No. 6 to 11)
・
Wind the chart onto the cylinder so that the end of the chart for start is put
under the other end.
・
Be sure to align both ends of the paper at the position of chart holder.
・
Ensure that the lower edge of the chart align with the cylinder bottom collar.
4. Remove the cap of cartridge pen. (Photo No. 14)
5. Set the time (Photo No. 16)
・
Turn the cylinder clockwise first and stop it at the position on 1 or 2 hours forwarder
than the present time. Set it to the present time turning the cylinder counter-
clockwise. This will enable you to set time correctly avoiding play in drum gear
mechanism.
NB : Time may be incorrect if procedure is done in wrong order.
6. Install the acrylic cover. (photo No. 17 to 19)
Make the carrying handle
vertical and install the acrylic
cover so that the plate “SK
SATO” comes to the front.