background image

 

 

5.  Open the lid pulling the lever outside. 

Insert batteries and close the lid. 

6. 

Insert two batteries and close the lid. 

 

 

7.  Remove chart holder. 

8. 

Change chart. 

 

 

9.  Attach chart holder. 

10.  Mount recording cylinder 

 

 

11.  Attach cylinder holding nut. 

12.  Lift pen holding clip and remove it. 

 

 

Summary of Contents for 7200-00

Page 1: ...Instruction Manual No 7200 00 Remote One Point Thermograph No 7202 00 Remote Two Point Thermograph ...

Page 2: ...transportation After unpacking place the unit in a stable atmosphere for one hour or more and confirm that the indicated valued is within the specified accuracy by comparison with the reliable thermometer If the indicated value is out of accuracy specified adjust the value referring to the Indication adjustment If there are anything unclear contact us or the dealer who purchased the unit from Proc...

Page 3: ...tside Insert batteries and close the lid 6 Insert two batteries and close the lid 7 Remove chart holder 8 Change chart 9 Attach chart holder 10 Mount recording cylinder 11 Attach cylinder holding nut 12 Lift pen holding clip and remove it ...

Page 4: ...ing it counterclockwise 14 Push pen lifting lever away from you until it stops 15 Set time 16 Turn carrying handle to the left and position the cover securely 17 Turn carrying handle clockwise until stops 18 Insert the sensing bulb into object ...

Page 5: ... Wind the new chart onto the cylinder so that the end of the paper will be put on the start of the chart Secure the overlapping section with the chart holder Make sure the markings the chart are aligned where the overlap occurs and the lower edge of the chart is against the bottom lip of the drum Setting the time Turn the cylinder counterclockwise to set the present time Turning the cylinder clock...

Page 6: ...ur instruments and we cannot guarantee the same accuracy with any other paper nor cartridge pen Do not repair the instrument by yourself Should repairs be necessary please return the instrument to the place of purchase Indication adjustment We calibrate the instrument at our factory so it is not necessary for you to make any other adjustments before use if some adjustment is required however follo...

Page 7: ...en the LED lamp goes out replace batteries to new ones NB Recording cylinder stops in one month after the LED lamp goes out Changing cylinder speed The cylinder speed switch is set for 7 day operation when shipped from the factory Set the switch at the top of cylinder clock to 32D for 32 day operation and change the chart to 32 day chart Cylinder speed switch 1 day operation of both model and 32 d...

Page 8: ... Our products are warranted to be free from defects in materials and workmanship for a period of one year from date of delivery If repair or adjustment is necessary and has not been the result of abuse or misuse within the one year period please return the units on Freight Prepaid basis and correction of the defect will be made without charges We alone will determine if the product problem is due ...

Reviews: