
10
3.3 Indicators
The following table lists the possible indicated conditions:
Green
Lamp-
"AC"
Red
Lamp-
"BAT"
Red
Lamp-
"LOW
BAT"
PM295
Display
Meaning
ON
Off Off
ON
PNA295-1 supplied by external
AC
power supply; battery is
charging slowly
Off
ON
Off
ON
PNA295-1 supplied by internal
charged
DC
battery
Off
ON
Blinking
ON
PNA295-1 supplied by internal
DC
power supply; battery needs
charging and will disconnect
automatically within 3 minutes
ON
Off
Off Off PNA295-1
is
connected
to
external
AC
power supply, slide
switch is OFF; battery is
charging rapidly
Summary of Contents for PNA295-1
Page 1: ...PNA295 1 Portable Network Analyzer Installation and Operation Manual BG0149 Rev B...
Page 2: ...PNA295 1 Portable Network Analyzer Installation and Operation Manual...
Page 18: ...13 Figure 2 3 PNA295 1 Connections for 4 Wire System Direct Connection...
Page 19: ...14 Figure 2 4 PNA295 1 Connections for 4 Wire Grounded Delta System Direct Connection...