Operation
Break-Down
The machine can be divided into two main parts.
1.
Chassis/Frame section – This comprises the handle bars, body
panels, Propane tank, Steel frame and wheels.
2.
Head – this comprises the motor, cover, grinding/satellite/
planetary heads and internal components
The machine has been manufactured to allow movement between the chassis
and head via the connection point. This movement is important during the
grinding process as it creates a “floating” effect for the head. The floating gives
the head a self leveling effect, negating the need to adjust the height of the
head as the machine passes over floor areas with different slopes or
undulations.
Set-Up
Position the grinder in the working area. Make sure there are diamonds
underneath the machine, and that the head locks are tight.
IMPORTANT
Planetary head and grinding heads are set to turn in opposite directions of each
other.(as shown in this depiction)
When using the machine, each grinding head must always have the
same diamond type and number of diamonds as the other heads.
Each diamond must also be the same height as the next.
The Rubber skirt must be adjusted so that a good seal is established,
between the floor and the drum.
When setting the height of the handle, the operator is the guide. The comfort of
the operator during grinding is key. The handlebar should rest right at the
operator’s hip bone. When the machine is running, there will be a grinding force
to one side that can be felt through the handlebars. Use the hip to resist this
force instead of the arms.
Transportation
When transporting, it is important to ensure the machinery is properly
secured at all times to eliminate “bouncing”. Ensure the chassis or frame section
of the machine is secured down at all times when in transit. The machine should
always be transported under cover limiting the exposed to natural elements – in
particular rain and snow. The machine should not be lifted by handle, motor,
chassis or other parts. Transportation of the machine is best done on a
pallet/skid to which the machine must be firmly secured. Do not attempt to slide
the tines/forks from a fork lift under grinding heads unless on a pallet/skid.
Failure to do so can cause extreme damage to grinding heads of machine and
internal parts.
Control Panel
The operator controls consist of a number of toggles and switches, giving 4
separate controls.
Ignition
Turn to “START” until motor starts, leave in “ON” until
finished. Turn to “OFF”, for motor stop.
Speed Control
The motor is connected to a throttle cable for speed
control. Twist to lock/Unlock, Pull for fast, push for slow.
Clutch
Engage/disengage the drum rotation
NEVER ENGAGE/DISENGAGE CLUTCH ABOVE 2000 RPM!
Machine Power-Up
Connect battery harness & propane tank.
Turn Key to “START” position for a moment
Turn Key to “ON” position
Drum Rotation
The green switch controls the electric clutch.
Do not engage the clutch above 2000 RPM’s
In case of emergency stop, disengaging the clutch above 2000 RPM’s could be
harmful to the motor. As some situations are more important than the service
life of your machine, we recommend you use your discretion.
Speed / Throttle
The grinding speed should start low and increase as the operator becomes more
comfortable with the application. Be sure that the RPM’s do not exceed 2000
when starting and stopping the drum rotation. The machine should be running
and the drum rotating before speed selection is fine tuned.
IMPORTANT
It is recommended that machinery be transported with a set of diamonds
attached at all times to ensure protection of locking mechanism for diamond
plates.
Summary of Contents for PDG 8000P
Page 1: ...Version 8K07 R1 Ser 2550 2650 Date 02 10 2019 PDG 8000 07 ...
Page 2: ......
Page 3: ......
Page 4: ......
Page 10: ......
Page 11: ......
Page 40: ...4 3 2 8 1 7 5 6 9 Top Plate Assembly SHEET 1 OF 1 SCALE 1 6 WEIGHT 48 9kg 5 4 3 2 1 PDG 8000 ...
Page 42: ...5 3 2 2 1 4 Drum Sheave SHEET 1 OF 1 SCALE 1 10 WEIGHT 5 4 3 2 1 3 ...
Page 46: ...6 4 3 5 2 7 1 PTO Tensioner Assembly SHEET 1 OF 1 SCALE 1 2 WEIGHT 1 99kg TITLE 5 4 3 2 1 ...
Page 54: ... MAIN BELT IDLER SHEET 1 OF 1 SCALE 1 4 WEIGHT 2 27kg 5 4 3 2 1 3 ...