Page 9
Part No. 000643, 26-m02-2013
Multilift Installation Guide
Step 6
Anchor lift to pad/floor
Anchor the lift to the pad/floor after verifying the running
clearance.
Procedure
1
Ensure the lift is positioned on the pad/floor so there is
an adequate running clearance between the top
landing and the platform per your site plan drawings.
2
Raise the platform to allow you to work underneath.
3
Double-check the position of the lift and then install the
anchor bolts through the four anchor points as shown
below.
4
Before tightening down the bolts, use shims (320651
shown below) as needed to ensure the lift is plumb and
level.
Figure 8
Shim 320651
5
Once complete, lower the platform back down to the
pad/floor.
Figure 9
Anchor points
Summary of Contents for Multilift
Page 1: ...INSTALLATION GUIDE Part No 000643 26 m02 2013 Multilift VERTICAL PLATFORM LIFT...
Page 7: ...Page 7 Part No 000643 26 m02 2013 Multilift Installation Guide Figure 2 Sample plan drawing...
Page 26: ...Page 26 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call flush remote...
Page 27: ...Page 27 Part No 000643 26 m02 2013 Multilift Installation Guide Hall call surface remote...
Page 28: ...Page 28 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call in frame...
Page 29: ...Page 29 Part No 000643 26 m02 2013 Multilift Installation Guide Landing gate harness...
Page 30: ...Page 30 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call only gate harness...
Page 41: ......