background image

      Page 35

Part No. 000643,  26-m02-2013

Multilift Installation Guide

Pro-Door Installation Method 2a: Anchored to concrete (walls shown here)

#/.#2%4%

#/.#2%4%7!,,
v4()#+ 

&,//2

02/$//2

#/.#2%4%7!,,
v4()#+ 
7)4(45"%
!.#(/23 

45"%!.#(/2

,).4%,334%%, 

45"%!.#(/23
).4/#/.#2%4% 

Summary of Contents for Multilift

Page 1: ...INSTALLATION GUIDE Part No 000643 26 m02 2013 Multilift VERTICAL PLATFORM LIFT...

Page 2: ...s that do not fit into the flow of the preceding text All note messages include the signal word NOTE in capitalized white lettering on a blue background DANGER WARNING CAUTION CAUTION NOTE Hazards and...

Page 3: ...p if required 18 Disassemble reassemble the acme screw if required 19 Before leaving job site 23 Maintenance 24 Disclaimer Savaria Savaria Concord Lifts Inc disclaims liability for any personal injury...

Page 4: ...install battery batteries Disassemble reassemble acme screw if required Before leaving job site Anchor lift to pad floor Position lift Power up lift for installation Anchor lift to pad floor Adjust li...

Page 5: ...act Savaria s Technical Support at 1 800 791 7999 for assistance 6 Ensure the electrical installation of a permanent power source complies with the electrical requirements provided on the plan drawing...

Page 6: ...pad floor ensuring that the running clearance between the top landing and the platform is per your plan drawings Refer to the plan drawings shipped with your lift A sample plan drawing is provided on...

Page 7: ...Page 7 Part No 000643 26 m02 2013 Multilift Installation Guide Figure 2 Sample plan drawing...

Page 8: ...low 3 The lift should be ready to run 4 If the lift does not run remove the panel in front of the controller and diagnose the problem electrically referring to the wiring diagrams shipped with the lif...

Page 9: ...nce between the top landing and the platform per your site plan drawings 2 Raise the platform to allow you to work underneath 3 Double check the position of the lift and then install the anchor bolts...

Page 10: ...UFL switch above the Up Normal Limit UNL switch in order to shut the entire lift down if it ever goes beyond the top landing This switch needs to be activated by the platform before any mechanical con...

Page 11: ...angle bracket down to the floor ground See Figure 12 NOTE Note that if your site has a hoistway or pit be sure to add the 1 4 to those dimensions Figure 12 Notch out landing Gate Landing Notch out la...

Page 12: ...is flush with the vertical landing surface Refer to Figure 11 on the previous page note that a gate is shown in Figure 11 instead of a door but the same concept applies Option 2 Install a 1 4 fascia p...

Page 13: ...10 Install hall calls as required Install the hall calls as required Procedure The hall calls may be flush mount surface mount or in frame depending on the job specifications Refer to the drawings pr...

Page 14: ...ins in a plastic bag provided with the gate Figure 18 Allen key and two pins Follow these steps to wind the spring hinges 1 Insert the Allen key into the hinge Increase the tension of the spring hinge...

Page 15: ...in the end of the closer rod and FIRMLY grasp both ends of the wire Release the vise grip pliers from the closer rod When the vise grip pliers are released slowly allow the closer rod to retract under...

Page 16: ...and connect them to the batteries 4 Connect the battery cables negative last for safety 5 Connect the power cord to a 110 VAC single phase 60 Hz 15 Amp dedicated circuit 6 The lift is now ready to ru...

Page 17: ...he power cord from the wall outlet 2 Remove the power cord plug from the cord 3 Remove the power cord grommet from the tower 4 Remove the cord from the zip tie anchor point s Figure 24 Power cord on l...

Page 18: ...ramp Figure 27 Remove automatic access ramp 4 Remove the hinge from the platform five screws Figure 28 Remove platform hinge 5 Reverse the position of the actuating arm from one side of the ramp to th...

Page 19: ...orm a Remove the underpan Figure 31 Remove underpan b Remove the car operating panel COP c Disconnect the travelling cable at the quick connect plug behind the COP Figure 32 Disconnect COP quick conne...

Page 20: ...e 38 Remove bolts holding roller supports to crossmember e Remove the two roller supports by sliding them up f Loosen the V belts by loosening the motor base four bolts Figure 39 Loosen V belts by loo...

Page 21: ...the back up nut The back up nut has to be positioned threaded in order to respect the minimum 3 8 and maximum 1 2 distances from the main nut as shown in Figure 44 3 Make sure the main nut and back up...

Page 22: ...ble is long enough to prevent it from hanging on the ground when at the lower landing 6 If for any reason the supports holding the top and lower bearings have been removed or loosened it is very impor...

Page 23: ...and the lift is safe and operational Procedure 1 Clean up the work area 2 Make sure all hardware has been tightened 3 Explain the operation of the elevator to the customer 4 Assist the customer on an...

Page 24: ...ety switch make sure it is in the proper location to the right of the load swtich Operation of the load switch Lower the platform to the ground using the hand crank in order to release the load on the...

Page 25: ...tallation Guide Appendix A Reference Drawings This appendix provides the following reference drawings Hall call flush remote Hall call surface remote Hall call in frame Landing gate harness Hall call...

Page 26: ...Page 26 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call flush remote...

Page 27: ...Page 27 Part No 000643 26 m02 2013 Multilift Installation Guide Hall call surface remote...

Page 28: ...Page 28 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call in frame...

Page 29: ...Page 29 Part No 000643 26 m02 2013 Multilift Installation Guide Landing gate harness...

Page 30: ...Page 30 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call only gate harness...

Page 31: ...Page 31 Part No 000643 26 m02 2013 Multilift Installation Guide Pro Door Installation Method 1 Anchor tube installation drywall...

Page 32: ...32 Multilift Installation Guide Part No 000643 26 m02 2013 Pro Door Installation Method 1 Anchor tube installation drywall 297 9035 2 v34 OR 8 v7 345 02 2 2 v 297 v 297 2 45 3 v 297 8 v 7 345 53 3 4...

Page 33: ...Part No 000643 26 m02 2013 Multilift Installation Guide Pro Door Installation Method 1 Anchor tube installation drywall v 297 2 02 2 v 297 3 5 2 3 53 7 4 2 4 53 4 2 2 3 0 2 2 297 2 2 2 4 X v X v 2 45...

Page 34: ...Page 34 Multilift Installation Guide Part No 000643 26 m02 2013 Pro Door Installation Method 2 Anchored to concrete...

Page 35: ...Page 35 Part No 000643 26 m02 2013 Multilift Installation Guide Pro Door Installation Method 2a Anchored to concrete walls shown here 2 4 2 4 7 v4 2 02 2 2 4 7 v4 7 4 45 23 45 2 4 3 34 45 23 4 2 4...

Page 36: ...Page 36 Multilift Installation Guide Part No 000643 26 m02 2013 Pro Door Installation Method 2b Anchored to concrete blocks shown here 5 3 2 02 2 2 4 3 47 3 2 4 3 47 3 5 3 v8 v 2 4 47 5 3 v8 v 2 4 47...

Page 37: ...Page 37 Part No 000643 26 m02 2013 Multilift Installation Guide Pro Door Installation Method 3 Angle plate connection no existing walls...

Page 38: ...Page 38 Multilift Installation Guide Part No 000643 26 m02 2013 Pro Door Installation Method 3 Angle plate connection no existing walls 2 0 4 0 4 0 4 0 4 02 2...

Page 39: ...Page 39 Part No 000643 26 m02 2013 Multilift Installation Guide Pro Door Installation Method 4 Angle plate connection existing walls...

Page 40: ...Page 40 Multilift Installation Guide Part No 000643 26 m02 2013 Pro Door Installation Method 4 Angle plate connection existing walls 02 2 7 7 0 4 0 4 0 4 0 4 2...

Page 41: ......

Page 42: ...al Platform Lift INSTALLATION GUIDE Part No 000643 Copyright 2013 Savaria Corporation Elevators and Lifts www savaria com Support 2 Walker Drive Brampton Ontario L6T 5E1 Canada Toll free 800 791 7999...

Reviews: