MAINTENANCE
5-47
SY95C Excavator OMM
0002352
Figure 5-93
5. Install new bucket teeth (6) and roll pins (7) in the
reverse order of removal.
Replace the Bucket
CAUTION
• Keep fingers and other body parts away from
pinch points to prevent crushing injuries while
removing or installing the bucket. Never put your
finger into the pin bore during alignment.
• Secure buckets after removal and before
servicing.
• Bucket pins may be ejected with extreme force
when removed forcefully. Do not allow anyone to
stand in front of the pins during removal.
• Never stand or place your feet or other body part
under the bucket when removing bucket pins.
Failure to follow these precautions could result in
injury.
1. Prepare the machine for service. See “Maintenance
0002279
Figure 5-94
2. Lower the bucket to the ground and support the
bucket to prevent it from rolling over when the bucket
pin is removed.
0002354
Figure 5-95
3. Remove the bucket pin hardware and bucket pins
(1 and 2) and remove the bucket (3) from the arm (4)
and linkage (5).
4. Clean the pins and pin bores. Lubricate the pin bores
with grease.
5. Align the arm with a new bucket. Make sure the
bucket is secured and will not move.
6. Align the arm and bucket and install the bucket pin.
Install the retaining fasteners into the pin.
7. Align the linkage to the bucket and install the bucket
pin. Install the retaining fasteners into the pin.
8. Grease the bucket pins.
9. Start the engine and run it at low idle. Operate the
bucket by slowly curling it in both directions to check
for binding.
6
7
1
5
2
3
4
Summary of Contents for SY95C
Page 2: ...Page Intentionally Blank ...
Page 146: ...5 48 MAINTENANCE SY95C Excavator OMM Page Intentionally Blank ...
Page 151: ...SPECIFICATIONS 6 5 SY95C Excavator OMM Load Point Radius and Height 0003873 Figure 6 3 ...
Page 154: ...6 8 SPECIFICATIONS SY95C Excavator OMM Page Intentionally Blank ...
Page 164: ...I 6 SY95C Excavator OMM ...
Page 165: ...Page Intentionally Blank ...