6901-002142 05
10
2 Mount the Wall Plate
Solid concrete or concrete block
2-1 Mark the wall
2-2 Drill pilot holes
2-3 Insert anchors
Use the 10mm (3/8 in.) bit to drill the top two holes to a depth of 75mm (3 in.).
Use the 5mm 3/16 in.) bit to drill the third hole to a depth of 32mm (1¼ in.).
CAUTION:
Avoid potential injuries or property damage!
Ù
Pilot
holes
MUST
be
drilled
to
the
depth,
and with the drill bits,
stated above.
Ù
Never
drill
into
the
mortar
between
blocks.
Insert lag bolt anchors
[05]
into the top two holes. Insert anchor
[21]
into the last hole.
CAUTION:
Improper
use
could
reduce
the
holding
power
of
the
lag
bolt.
To
avoid
potential
injuries
or
property
damage: Be
sure
the
anchors
[05, 21]
are seated
fl ush
with
the
concrete
surface.
For assistance in determining wall plate location, see Height Finder at
sanus.com.
Level the wall plate
template
[03]
and mark the hole locations. The
third hole is for the cable management clamp
[19]
and is optional.
CAUTION:
Avoid potential injuries or property damage!
Ù
Mount the wall plate
[01]
directly onto the concrete surface.
Ù
Minimum solid concrete thickness: 203mm (8 in.).
Ù
Minimum concrete block size: 203 x 203 x 406 mm (8 x
8
x 16 in.).
13 mm
(1/2 in.)
10 mm
(3/8 in.)
[03]
5 mm
(3/16 in.)
2-4 Insert lag bolts
[05]
[05]
[21]
[05]
[06]
[05]
[21]
Insert only the top plate lag bolt [06] at this time.
CAUTION:
Improper
use
could
reduce
the
holding
power
of
the
lag
bolt.
To
avoid
potential
injuries
or
property
damage:
DO NOT
over-
tighten the lag bolt
[06]
.
OPT
OPT
75 mm (3 in.)
32 mm (1¼ in.)
Summary of Contents for VMF322
Page 5: ...6901 002142 05 5 ...