INSTALLATION GUIDE
MODULAR SUNWAY TG
TE OD
Rev. 03
– 01/06/2018
5/
139
COMPATIBILITY WITH SINGLE SECONDARY FOR MULTI-MPPT PRODUCTS ...... 90
INDEPENDENT OUTPUT POWER MEASUREMENT (WATTMETER) ....................... 90
EXTERNAL COOLING SYSTEM CONTROL .............................................................. 91
DC INPUT COMPONENTS DIMENSIONING ................................................... 92
CHECKING THE EXTERNAL AND INTERNAL CONDITIONS ................................... 96
CHECKING THE EMERGENCY STOP BUTTON ..................................................... 100
CHECKING THE DOOR MICROSWITCHES ............................................................ 100
CHECKING THE SEALS, LOCKS AND HINGES ...................................................... 101
CHECKING CONTROL AND AUXILIARY VOLTAGES ............................................. 102
CHECKING THE RELAYS, FUSES AND DISCONNECT SWITCHES ...................... 103
CALIBRATION OF ENVIRONMENTAL SENSORS ................................................... 104
CHECKING THE TIGHTENING TORQUE ................................................................ 104
CHECKING THE STATUS SWITCHES FOR DC INPUTS FUSES ........................... 104
THE INVERTER DOES NOT START WHEN THE START BUTTON IS PRESSED ... 106