ENGLISH
– ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH
6/
14
Part list
1. Ceiling
(12-1. Outside of Handle.
2. Back wall
(12-2. Silicon Cushion×2)
3. Sunk screw (5×60=16)
(12-3. Glass door)
4. Left side wall
(12-4. Wooden fixing bar)
5. Electronic box
(12-5. Hexagon socket head cap screw
(8×45=2pcs)
6. Round head screws for Electronic box
(
4×12=4pcs)
(12-6. Cover of Decorative screws)
7. The bottom board
(12-7. mounting screw for inside handle 4*35=2pcs
8. Safety guard for Front Red glass heater.
(12-8 .Insert nuts of Decorative screws)
(10-1. Safety guard)
(12-9. Handle inside
(10-2. Sunk screws for supporting frame 4×35=8)
13. Front panel (with glass door)
(10-3. Triangular supporting frame×4)
14. Front Red glass heater×2
9 .Round head screws for front Red glass heater 4×12=8pcs 15. Sunk screws for Front Safety guard (4×35=8pcs)
10. Bench board
16. Back Safety guard
11. Bench frame
17. Sunk screws for Back Safety guard (4×35=8pcs)
12. Handle
18. Right side wall
19. Fixing screws for Roof ST5×60=10
)