
Installation
82011-IM, REV J
Sandel SG102 & MT102 Installation Manual
Page 3-6
Figure 3-2: SG102-0xx w/MOD 1, -1xx, -2xx, -3xx installed in Mounting Base Assembly
Figure 3-3 SG102-XXX w/MOD 2 installed in Mounting Base Assembly
Figure 3-4 SG102-X5X (SG102/D) installed in Mounting Base Assembly
3.8
Post Installation Summary
Prior to installing the SG102, a point-to-point continuity check of the wiring harness should be
accomplished to verify proper wiring. See FUNCTIONAL GROUND TEST PROCEDURES
/ REPORT in the appendix for verification of this step and other checks. Apply power to the
SG102 and check that the status lights indicate correctly. (See section 7.1 for details).
Perform Ground Test procedures.