18    S&C Instruction Sheet 663-500

Installation

If the gasket does not compensate for an 

uneven foundation, grout the bottom of the 
enclosure as necessary. The grout should be 
recessed enough to permit caulking. To com-
plete the installation, caulk around the bottom 
of the enclosure with a weatherproof compound 
applied with a standard caulking gun. A room-
temperature vulcanizing (RTV) silicon-rubber 
compound is recommended. Apply a suitable 
compound to fill the spaces between the cable 
and the conduit, and cap all empty conduits to 
prevent the entry of moisture or animals.

STEP  15.  

Follow this procedure before leaving the site:

(a)  Remove the lifting tabs and replace the bolts to 

plug the blind-tapped holes.

(b)  Check the interior of the pad-mounted gear. 

Remove all foreign materials and tools that may 
have been mislaid, and sweep the interior clear of 
debris.

(c)  Remove the tie wraps securing the dual-purpose 

barriers to the inside of the door.

(d)  Wipe barriers, insulators, switches, fuses, and 

terminators clean with a mineral-spirits solvent 
and dry with a clean cloth.

(e)  Hang dual-purpose front barriers in their normal, 

suspended positions. Also install optional inner 
barrier panels, if furnished.

 WARNING

Do not leave dual-purpose front 

 

barriers in the “slide-in” position for more  
than one week . These barriers are 
intended for temporary use in the “slide-in” 
position while work is being performed . If the  
barriers are left in this position for an 
extended period of time, there is the 

 

possibility of corona discharge to the 
barriers .
Prolonged exposure to corona discharge 
can damage the barriers and result in a 
flashover, injury, and equipment damage .

(f)  Store spare SMU-20® Fuse Units or SM-4® Refill 

Units (as applicable) in the fuse-storage racks 
inside the fuse-compartment doors. Storage for 
Fault Fiter® Electronic Power Fuses or current-
limiting fuses cannot be provided in these racks.

(g)  Wipe down the exterior of the enclosure with a 

clean, damp cloth. To preserve the integrity of 
the surface, refinish any scratches or abrasions 
with S&C touch-up finish and red-oxide primer, 
which are available in aerosol spray cans. Order 
catalog number 9999-058 for olive-green finish, 
9999-080 for light gray finish, and 9999-061 for 
red-oxide primer. No other finish or primer is 
approved. The area to be touched up should be 
cleaned to remove all oil and grease. Sand the 
area, removing any traces of rust that may be 
present, and make sure all edges are feathered 
before applying primer.

(h)  Labels indicating the area around the pad-

mounted gear must be kept clear so work on the 
gear can be done safely are provided. These 
labels (or equivalent labels) should be affixed to 
the exterior of the gear. 

(i)  Refer to Instruction Sheet 663-503 for 

 

instructions about installing and closing the 
fuses.

NOTICE

When installing and closing a fuse, use an 
S&C Grappler™ Handling Tool attached to a  
suitable universal pole to ensure 

 

complete fuse closure is attained . Failure to  
completely close the fuse can result in 

 

damage to the Uni-Rupter® Interrupter 
Switch when the gear is energized .

When the installation is completed, refer to the  

applicable S&C instruction sheets for operating instruc-
tions regarding the pad-mounted gear and source-transfer 
control.

Summary of Contents for PMH

Page 1: ...nstruction Sheet 2 Retain this Instruction Sheet 2 Proper Application 2 Warranty 2 Safety Information Understanding Safety Alert Messages 3 Following Safety Instructions 3 Replacement Instructions and...

Page 2: ...C Source Transfer PMH Pad Mounted Gear Designate a location where you can easily retrieve and refer to this publication Proper Application WARNING The equipment in this publication is only intended f...

Page 3: ...autions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If y...

Page 4: ...COMPANY S C 6601 NORTH RIDGE BOULEVARD CHICAGO ILLINOIS AND NEITHER RECEIPT NOR POSSESSION THEREOF INFERS OR TRANSFERS ANY RIGHT IN OR LICENSE TO USE THIS DOCUMENT THE SUBJECT MATTER THEREOF OR ANY D...

Page 5: ...l circuits and component parts live until completely de energized tested grounded and tagged or properly identified Do not work on or near this equipment unless you 1 Know and obey your employer s wor...

Page 6: ...ng any device that is to be inspected replaced serviced or repaired in the high voltage compartments 9 MAINTAINING PROPER CLEARANCE Always maintain proper clearance from energized components 10 SWITCH...

Page 7: ...ons about field programming and opera tion of the Micro AT control refer to S C Instruction Sheet 515 500 These instruction sheets along with a catalog dimensional drawing showing cable locating and a...

Page 8: ...ed by the packing materials and will also prevent wind induced abrasion from loose cardboard Storage S C Source Transfer PMH Pad Mounted Gear should installed and energized immediately When the gear i...

Page 9: ...socket wrench or tool when catalog number suffix B1 or B2 is specified to unlatch the Penta Latch Mechanism by rotating the actuator counterclockwise approximately 60 degrees against spring resistanc...

Page 10: ...latched a padlock may be inserted into the hasp Placement STEP 2 At the installation site remove all separately packaged components shipped in the pad mounted gear enclosure and set them aside in a p...

Page 11: ...the saddle of the bracket or install the cable wrap until instructed to do so in Step 5 on page 13 Figure 5 Side view of the switch showing the interphase barrier attachment points terminal pad conne...

Page 12: ...or 14 4 kV 2 57 for 25 kV Minimum clearance from energized parts to barriers 13 for 14 4 kV 1 32 for 25 kV Minimum clearance from energized parts to electrical ground 6 152 for 14 4 kV 7 191 for 25 kV...

Page 13: ...taping it with a suitable material Two position cable terminator adapters are provided at the fuse hinge assemblies See Figure 7 These adapters can be placed in their alternate positions when require...

Page 14: ...elleville washers are flat Then back off one half turn Do not use lockwashers with Belleville washers For tinned copper or tinned bronze connectors Use inch galvanized steel hardware with one Bellevil...

Page 15: ...n accordance with the wiring diagram provided The automatic source transfer scheme will not operate properly when only six current sensors are installed S C Current Sensors STEP 7 Six S C Current Sens...

Page 16: ...alog number suffix C9 or C10 optional Remote Indication feature catalog number suffix Y4 or optional Supervisory Control feature catalog number suffix Y6 are also located in the terminal block compart...

Page 17: ...ier support angle at the front of the switch compartment Make sure the clearance from the barriers to energized parts and from the barriers to terminator skirts conforms to the minimum dimensions spec...

Page 18: ...barriers Prolonged exposure to corona discharge can damage the barriers and result in a flashover injury and equipment damage f Store spare SMU 20 Fuse Units or SM 4 Refill Units as applicable in the...

Page 19: ...Testing When high voltage dielectric tests will be performed on S C Source Transfer PMH Pad Mounted Gear special precautions should be taken to prevent damage to the voltage sensors and voltage limit...

Reviews: