CW-6000/6100/6200 Series
5
<3> Installation
It is very simple to install this industrial cooling machine. The installation for the
first time of the new machine can be carried out by following steps:
1. Open the package to check if the machine is intact and all the necessary
accessories are completed.
2. Open the injection port to feed cooling water. (Do not let the water spill over!)
Observing the water level gauge and adding water slowly, be careful not to
have the water overflowed! For the cooling of carbon steel equipment, the
water should be added an appropriate amount of cooling water additive
(anti-corrosion water aqua). Working in cold north area, it’s better to use
noncorrosive antifreeze fluid.
3. According to system conditions, please connect the water inlet and outlet pipe
well.
4. Plug in power, turn on the power switch. (Do not start up without water in the
water tank!)
(1) Power switch turned on, the circulation pump of the chiller starts working. The
first time of operating may cause more bubbles in the pipe leading to a flow
alarming occasionally, but running for a few minutes later, it will go back to
normal.
(2) After the first boot, you must immediately check whether the water pipe leaks.
(3) Power switched on, if the water temperature is below the set value, it is normal
that fans and other components of the machine do not work. The temperature
controller will automatically control the working conditions of the compressor,
magnetic valve, fans and other parts based on the set controlling parameters.
(4) As it takes a longer time to start over the compressor and other components,
according to different conditions, the time is range from seconds to minutes, so
do not turn off the power and again on frequently.
5. Check the water level in the water tank.
The first startup of the new chiller empties the air in the water pipe, leading a
slight water level decline, but in order to keep the water level in the green area,
it’s allowed to add adequate water again. Please observe and record the current
water level, and inspect it again after the chiller running for a period of time, if
the water level drops obviously, please re-inspect the water pipeline leakage.
6. Adjust parameters of temperature controller.
CW-6000/ 6100/ 6200 series use an intelligent thermostat. Normally users do not
need to adjust it. If it is really necessary, please refer to page 17, “Operating
status and parameters adjustment.”