Reference Information
14-14
Samsung Electronics
14-1-4-2 Loading
Cassette in
Housing down.
Motor Loading rotates.
Drum rotates.
Chassis Sub moves in
direction of arrow.
Gear Worm Loading Motor
Gear Worm Loading
Gear Wheel
Gear Tension
Gear Cam Main rotate.
Motor Capstan rotates.
Gear Capstan, Belt Timing,
Gear Pully and Gear ldler
rotate in order.
Reel T rotates.
Motor Capstan stops.
Chassis Sub stops at
Loading-complete
position
Gear Loading S and T
rotate.
Arm Tension, Arm
Review and Arm Pinch
Roller move.
Pole Base S,T attach
to Base Drum.
Motor Loading stops.
Pinch Roller attaches to
Capstan Shaft.
Brake S released from
Reel S.
Motor Capstan rotates
back.ward silghtly and
forward.
Pinch Roller rotates
forward.
Pinch Roller rotates via
Silder Main and
detaches from Capstan
Shaft.
Brake S operated by
Gear Cam main and T
operated by rotated
direction and contact
Reel S, T for braking.
Motor Loading rotates
reverse and then stops.
Drum stops.
Motor Capstan stops.
* This operation makes tape loading.
Arm Loading S,T move in
direction of arrows and
pole Base S,T silde.
Brake T released from
Reel T.
Reel S, rotates.
Pinch Roller rotates in
reverse.
Motor Loading rotates in
reverse and then stips.
When Moror Loading is
in reverse, Silde Main
moves to right.
Motor Castan rotates
silghtly(for shifting idler to
Reel S)and then stops.
All manuals and user guides at all-guides.com
Summary of Contents for VP-D361W
Page 129: ...Samsung Electronics 8 1 8 Wiring Diagram All manuals and user guides at all guides com...
Page 130: ...Wiring Diagram 8 2 Samsung Electronics MEMO All manuals and user guides at all guides com...
Page 140: ...PCB Diagrams 9 10 Samsung Electronics MEMO All manuals and user guides at all guides com...
Page 190: ...Troubleshooting 12 12 Samsung Electronics MEMO All manuals and user guides at all guides com...