Samsung Electronics
14-7 Installation Diagram of Indoor Unit and Outdoor Unit
14-7-1 Air-Purge Procedure
1) Connect each assembly pipe to the appropriate valve
on the outdoor unit and tighten the flare nut.
3) Open the valve of the low pressure side of
manifold gauge counter-clockwise.
4) Purge the air from the system using vacuum pump
for about 30 minutes.
– Make sure that pressure gauge show
-0.1MPa(-76cmHg) after about 30 minutes.
– This procedure is very important in order to avoid
gas leak.
– Turn off the vacuum pump.
– Close the valve of the low pressure side of
manifold gauge clockwise.
– Remove the hose of the low pressure side
of manifold gauge.
7) Check for gas leakage.
- At this time, especially check for gas leakage from
the 3 way valve’s stem nuts, and from the service
port cap.
2) Connect the charging hose of low pressure side of
manifold gauge to the packed valve having a service
port as shown at the figure.
5) Set valve cork of both liquid side and gas side of
packed valve to the open position.
6) Mount the valve stem nuts and the service port cap
to the valve, and tighten them at the torque of
183kgf•cm with a torque wrench.
A
B
C
D
Outdoor unit
Indoor unit
Gas pipe side
Liquid pipe side
Vacuum Pump
A
(gas)
B
(liquid)
Valve stem
Stem cap
14-9
24867A(1)_TH026EAV_1.indd 15
2006-05-09 ソタネト 2:57:34
Summary of Contents for TH060EAV
Page 48: ...MEMO Samsung Electronics 4 26 ...
Page 59: ...Samsung Electronics 5 4 Ass y Control Out UH026EAV DB93 03453B UH035EAV DB93 03453A 5 11 ...
Page 145: ...13 6 Samsung Electronics OUTDOOR FAN B D DIODE IPM DC_LINK CAP SMPS IGBT Block Diagram ...
Page 156: ...MEMO Samsung Electronics 14 11 ...
Page 157: ...Samsung Electronics MEMO 14 12 ...