Confidential
Chapter 4 Inspect the Installation
MTP02P Series Installation Manual v1.0
87
Copyright © 2018, All Rights Reserved.
Category
Check Items
Criteria
Result
Pass
Fail
Assembly condition of a connector
Fastening condition of a connector
Checking compliance with fastening
torque value
Installation status of cable
tag
Position
Marking content
Checking tag installation method
Others
Reserved ports
Checking port cap fastening status
Cable inlet
status/Connection of
equipment I/O port
Checking fastening status
(Conduit/Cable Gland)
Cable tray and duct
Checking installation status
Status of inside/outside of
the equipment and system
surrounding area
Checking the stocking condition (waste
parts, waste materials, packing
materials, and so on)
Opinion
■