Samsung Multifunction MultiXpress X4220, X4250, X4300, X401, K4250, K4300, K4350, K401 Series
75
Copyright
2014 SAMSUNG ELECTRONICS Co., Ltd., All rights reserved
6.2.4.2
ALC_CMS.2 Parts of the TOE CM coverage
Dependencies:
No dependencies.
Developer action elements:
ALC_CMS.2.1D
The developer shall provide a configuration list for the TOE.
Content and presentation elements:
ALC_CMS.2.1C
The configuration list shall include the following: the TOE itself; the
evaluation evidence required by the SARs; and the parts that
comprise the TOE.
ALC_CMS.2.2C
The configuration list shall uniquely identify the configuration items.
ALC_CMS.2.3C
For each TSF relevant configuration item, the configuration list shall
indicate the developer of the item.
Evaluator action elements:
ALC_CMS.2.1E
The evaluator shall confirm that the information provided meets all
requirements for content and presentation of evidence.
6.2.4.3
ALC_DEL.1 Delivery procedures
Dependencies:
No dependencies.
Developer action elements:
ALC_DEL.1.1D
The developer shall document and provide procedures for delivery of
the TOE or parts of it to the consumer.
ALC_DEL.1.2D
The developer shall use the delivery procedures.
Content and presentation elements:
ALC_DEL.1.1C
The delivery documentation shall describe all procedures that are
necessary to maintain security when distributing versions of the TOE
to the consumer.
Evaluator action elements:
ALC_DEL.1.1E
The evaluator shall confirm that the information provided meets all
requirements for content and presentation of evidence.
6.2.4.4
ALC_FLR.2 Flaw reporting procedures
Dependencies:
No dependencies.
Developer action elements:
ALC_FLR.2.1D
The developer shall document and provide flaw remediation
procedures addressed to TOE developers.
ALC_FLR.2.2D
The developer shall establish a procedure for accepting and acting
upon all reports of security flaws and requests for corrections to those
flaws.