English
27
Installation checklist
•
The dryer is plugged into a properly grounded outlet.
•
All packaging material is completely removed and properly disposed.
• The dryer is level and standing firmly on the floor.
•
Start the dryer to make sure that it runs, heats, and shuts off.
•
Run a
TIME DRY
cycle for 20 minutes to see if the
HC
information code is
displayed. If this is the case, contact a local service centre.
•
After installation, we recommend that you wait at least 1 hour before using the
dryer.
Before using the dryer
•
Make sure no accessory remains inside the drum.
•
Plug in the power cord just before operating the dryer.
•
Do not block the air inlet hole of the cooling grill at the front of the dryer.
• Do not place inflammable objects near the dryer and keep the surroundings clean.
•
Keep the dryer level with the ground.
•
Do not remove the adjustable levelling legs of the dryer. They are necessary to
keep the dryer level with the ground.
Installation
DV5000T_DC68-04209F-00_EN.indd 27
2020/9/8 14:05:15