22 _ Disassembly and Reassembly
Figure
Description
ORIFICE SPUD
NO.43
(LNG)
ORIFICE SPUD
NO.54 or 55
(LPG)
4. Remove the BUNER ORIFICE SPUD and
replace it with matching length ORIFICE
SPUD from Kit.
Check the number of the ORIFICE
SPUD before change it.
5. Reassemble the TUBE BURNER.
LEAK
LIMITER
(LNG)
REGULATOR BLOCK
OPEN PLUG
(LPG)
6. Remove the LEAK LIMITER from the top of
the pressure regulator.
7. Install REGULATOR BLOCK OPEN PLUG
on top of pressure regulator and tighten
moderately.
<LNG>
<LPG>
LP
LP
N
N
LP
LP
N
N
8. Loosen the screw securing the shutter, rotate
the shutter until the end of the slot labeled
“LP” contacts the screw. Tighten the screw to
lock the shutter in place.
The LP gas converted dryer should have
an input of 22,000BTU/hr or 20,000BTU/
hr. with a manifold pressure of 11 in.
W.C.P.(Water Column Pressure).