81
12-6-2 "Pump down" Procedure
Pump down will be carried out when an evaporator is replaced or when the unit is relocated in another area.
Relocation of the air conditioner
entering.
At this time, cover the valve of the outdoor unit and the other pipe using a cap or vinyl plug to avoid foreign
material entering.
4) Turn the 3 way valve clockwise to close.
1) Remove the caps from the 3 way valve and the
3 way valve.
2) Turn the 3 way valve clockwise to close and
connect a pressure gauge (low pressure side)
to the service valve, and open the 3 way valve
again.
3) Set the unit to cool operation mode.
(Check if the compressor is operating.)
5) When the pressure gauge indicates "0" turn the
3 way valve clockwise to close.
6) Stop operation of the air conditioner.
7) Close the cap of each valve.
3 way Valve
2 way Valve
Summary of Contents for AR09TXFYAWKNEU
Page 43: ...43 8 3 DISPLAY PCB DB92 04833B ...
Page 68: ...68 11 1 Indoorunit 11 Block Diagram ...
Page 69: ...69 11 2 Outdoorunit ...