119
SAMSUNG ELECTRONICS
12-6 Installation Diagram of Indoor Unit and Outdoor Unit
12-6-1 Air-Purge Procedure
1) Connect each assembly pipe to the appropriate valve on
the outdoo
2) Connect the charging hose of low pressure side of
manifold gauge to the packed valve having a
service port (3/8" Packed valve) as shown at the
figure.
Indoor unit
Outdoor unit
A
C
Gas pipe side
D
Liquid pipe side
B
6) Mount the valve stem nuts to the 2 way and
3 way valve. And mount the service port cap to
3 way valve.
3) Open the valve of the low pressure side of manifold
gauge counter-clockwise.
4) Purge the air from the system using vacuum pump for
about 30 minutes.
- After that, please recheck that pressure is stabilized.
- Close the valve of the low pressure side of manifold
gauge clockwise.
- Remove the hose of the low pressure side
of manifold gauge.
5) Set valve cork of both liquid side and gas side of packed
valve to the open position.
Vacuum Pump
7) Check for gas leakage.
- At this time, especially check for gas
leakage from the 3 way valve's stem nuts,
and from the service port cap.
Valve stem
Stem cap
A
(gas)
B
(liquid)
Summary of Contents for AR09TXFCAWKNEU
Page 78: ...77 SAMSUNG ELECTRONICS 7 Wiring Diagram 7 1 Indoor Unit CODE DB68 08680A 01 ...
Page 80: ...79 SAMSUNG ELECTRONICS 8 PCB Diagram 8 1 Indoor Main PCB DB92 04839A ...
Page 81: ...80 SAMSUNG ELECTRONICS 8 2 Outdoor PCB DB92 04837A ...
Page 82: ...81 SAMSUNG ELECTRONICS ...
Page 84: ...83 SAMSUNG ELECTRONICS 8 4 DISPLAY PCB DB92 04833B ...
Page 107: ...106 SAMSUNG ELECTRONICS 11 Block Diagram 11 1 Indoor unit ...
Page 108: ...107 SAMSUNG ELECTRONICS 11 2 Outdoor unit ...
Page 118: ...117 SAMSUNG ELECTRONICS ...