108
12-6 Installation Diagram of Indoor Unit and Outdoor Unit
12-6-1 Air-Purge Procedure
A
B
C
D
Outdoor unit
Indoor unit
Gas pipe side
Liquid pipe side
Vacuum Pump
A
(gas)
B
(liquid)
Valve stem
Stem cap
1) Connect each assembly pipe to the appropriate valve on
the outdoo
6) Mount the valve stem nuts to the 2 way and
3 way valve. And mount the service port cap to
3 way valve.
2) Connect the charging hose of low pressure side of
manifold gauge to the packed valve having a
service port (3/8" Packed valve) as shown at the
re.
3) Open the valve of the low pressure side of manifold
gauge counter-clockwise.
4) Purge the air from the system using vacuum pump for
about 30 minutes.
- After that, please recheck that pressure is stabilized.
- Close the valve of the low pressure side of manifold
gauge clockwise.
- Remove the hose of the low pressure side
of manifold gauge.
5) Set valve cork of both liquid side and gas side of packed
valve to the open position.
7) Check for gas leakage.
- At this time, especially check for gas
leakage from the 3 way valve's stem nuts,
and from the service port cap.
Summary of Contents for AR09RXFPEWQNEU
Page 67: ...67 7 1 IndoorUnit AR09RXFPEWQNEU AR12RXFPEWQNEU AR18RXFPEWQNEU AR24RXFPEWQNEU 7 Wiring Diagram...
Page 69: ...69 7 2 OutdoorUnit AR24RXFPEWQXEU DB68 06675A DB68 06675A 00...
Page 70: ...70 8 1 IndoorMain PCB CODE DB92 03467G 8 PCB Diagram...
Page 71: ...71 8 2 OutdoorMain PCB CODE DB92 04029D...
Page 72: ...72 8 3 OutdoorPCB InverterCODE DB92 04025C...