12
English
Inst
allat
ion Pr
oc
edur
e
Step 12 Optional: Changing the direction
of the drain hose
Change the direction only when it is necessary.
1
Detach the rubber cap with the flyer.
Drain hose
Screw hole
Screw
2
Detach the drain hose by pulling it and turning to the left.
3
Insert the drain hose by fixing it into the groove of the drain
hose and the outlet of the drain pan.
Drain pan
outlet
Rubber cap
4
Attach the rubber cap with a screwdriver by turning it to the
right until it fixes to the end of the groove.
5
Check for leakage on both side of the drain outlet.
Pour the water in direction of arrow.
Direction of the drained water
CAUTION
•
Make sure that the indoor unit is in upright position when you
pour water to check for leakage. Make sure that the water does
not overflow onto the electrical part.
Step 13 Connecting the power and
communication cables
CAUTION
•
Always remember to connect the refrigerant pipes before
performing the electric connections.
When disconnecting the system, always disconnect the
electric cables before disconnecting the refrigerant pipes.
•
Always remember to connect the air conditioner to
the grounding system before performing the electric
connections. Use a crimp ring terminal at the end of each
wire.
The indoor unit is powered through the outdoor unit by means of a
H05RN-F connection cable (or a more power model), with insulation
in synthetic rubber and a jacket in polychloroprene (neoprene), in
accordance with the requirements specified in the standard EN
60335-2-40.
1
Remove the screw on the electrical component box and
remove the cover plate.
2
Route the connection cord through the side of the indoor
unit and connect the cable to the terminals refer to the figure
below.
3
Route the other end of the cable to the outdoor unit through
the ceiling & the hole on the wall.
4
Reassemble the electrical component box cover, carefully
tightening the screw.
Installation Procedure
Summary of Contents for AR BSHUMGM Series
Page 18: ......