Base ground contruction
(when Installing on the ground)
Drain hole
150 mm or more
When the outdoor unit needs to be supported,fix it with wire as shown in the picture .
-
Slightly unwind the four screws on the cover top of the outdoor unit .
-
Wind wires round the four screws and fasten the screws again .
-
Fix the wires to the ground .
(when Installing on the roof)
Install the outdoor unit
horizontally on the ground
150 mm or more
The outdoor unit should be supported within the range of measurement below for base ground work .
•
If the outdoor unit is not fixed securely,product may fall and it might cause loss of life or property damage .
•
Do not install the outdoor unit on the wooden pallet .
•
Fix the outdoor unit securely to the base ground with anchor bolts .
•
The manufacturer is not responsible for the damage occurred by not adhering to the standard of the
installation .
•
To protect the outdoor unit from external condition such as rain, install it on the base ground and connect
the drain pipe to the drainage .
CAUTION
Base construction and installation of the outdoor unit
620
940
330
360
384
Anchor bolt hole
Type A
Anchor bolt position
620
940
460
464 520
Type B