DOC9091B |
18
Truck Master 1700
4 INSTALLATION AND START-UP
4.1 Securing the pump
Installation requirements must be observed, otherwise there is a risk of damage
Immediate before connecting the pipes, remove protective covers. Connection of the pump’s suction and
pressure pipe connections must be made with a gasket in between (C).
The M16 bolts must be tightened with 180 Nm (B).
In order to prevent tensions in the pump, the pipe connections (A) must be tensionless while tightening the
bolts.
4.2 Connections to the pump
• Check for foreign objects in the pump and physical damage on pump
• Gaskets to be handeled with highest degree of caution
• Gasket and sealing surfaces must be cleaned before assembly
DOC1627507
A
A
DOC1627507
DOC1627507_1
B
A
C
DOC1627507_1
The pump must be installed on a stable foundation, which must be level and stable, so that the pump is not
twisted or exposed to a profile distortion.
The pump must be installed with 4 pcs. M16 bolts, 2 pcs. in front and 2 pcs. in back.
The bolts must be tightened to 180 Nm (A).