![Samson EB 31a-23 Mounting And Operating Instructions Download Page 39](http://html1.mh-extra.com/html/samson/eb-31a-23/eb-31a-23_mounting-and-operating-instructions_4031618039.webp)
9-13
EB 31a-23_EN
Edition: November 2021
Speci
fi
cations subject to change
Service
Fig.
|
9-28:
Reassamble the Cup seal
Fig.
|
9-29:
Reassemble the End caps
Fig.
|
9-30:
Reassemble the cap screws
Ö
Fit the end-cap (30) in to the body HCD (301H) verifying that
the O-ring (14) remains in its groove.
Risk of components damage due to incorrect assembly!
During reassembling the end caps can be damaged due to une-
ven force generated by compressed springs.
Ö
Assemble the end caps as shown in Fig. 9-29 keeping a con-
stant distance (A = B) between the actuator body and the end
cap interface.
Ö
Observe the speci
fi
ed sequence shown in Fig. 9-30.
Ö
Insert all the end cap screws (318) or all nut (318A) with
washer (318B) and tighten each only partially.
Ö
Complete tightening by making 1-2 turns for each screw in
the sequence shown in Fig. 9-30 until tightening is complet-
ed.
Ö
Refer to section “15.1.1 Tightenng torque” for the screw tight-
ening torque table.
Proceed as above described at section 9.5.3 and 9.5.4 on the
other side of the actuator.
9.5.5 HCD
chamber
fi
lling
Refer to Fig. 9-1, Fig. 9-2, Fig. 9-31, Fig. 9-32, Fig. 9-33,
Fig. 9-34 and Fig. 9-35
Before
fi
lling the HCD bodies it is recommended to carry out a
leakage test.
Ö
Put the actuator with HCD bodies ports “C“ and “D“ in verti-
cal position.
Fig.
|
9-31:
Fill the HCD chamber
Ö
Through the ports “C“ or “D“
fi
ll the bodies HCD
(301H/302H) with the proper liquid. See table below for the
quantity for 90° rotation.
Ö
To do the
fi
lling, connect port C and D to the liquid container
using pipes.
The use of graduated containers is recommended to monitor the
quantity of poured liquid.
NOTICE
NOTICE
Tipp
Summary of Contents for EB 31a-23
Page 20: ...5 4 EB 31a 23_EN Edition November 2021 Specifications subject to change Mounting and assembly...
Page 22: ...6 2 EB 31a 23_EN Edition November 2021 Specifications subject to change Start up...
Page 24: ...7 2 EB 31a 23_EN Edition November 2021 Specifications subject to change Operation...
Page 26: ...8 2 EB 31a 23_EN Edition November 2021 Specifications subject to change Malfunctions...
Page 42: ...9 16 EB 31a 23_EN Edition November 2021 Specifications subject to change Service...
Page 44: ...10 2 EB 31a 23_EN Edition November 2021 Specifications subject to change Decomissioning...
Page 48: ...12 2 EB 31a 23_EN Edition November 2021 Specifications subject to change Repairs...
Page 50: ...13 2 EB 31a 23_EN Edition November 2021 Specifications subject to change Disposal...
Page 52: ...14 2 EB 31a 23_EN Edition November 2021 Specifications subject to change Certificate...
Page 53: ...14 3 EB 31a 23_EN Edition November 2021 Specifications subject to change Certificate...
Page 54: ...14 4 EB 31a 23_EN Edition November 2021 Specifications subject to change Certificate...
Page 61: ...EB 31a 23_EN Edition November 2021 Specifications subject to change...
Page 62: ...EB 31a 23_EN Edition November 2021 Specifications subject to change...
Page 63: ...EB 31a 23_EN Edition November 2021 Specifications subject to change...