
10-2
EB 2626-1 EN
Decommissioning
To decommission the regulator for service
work or disassembly, proceed as follows:
1. Close the shut-off valve (1) on the down
-
stream and upstream side of the regula
-
tor.
2.
Completely drain the pipelines and regu
-
lator.
3. Depressurize the plant.
4. Shut off or disconnect any external con
-
trol line.
5.
If necessary, allow the pipeline and reg
-
ulator components to cool down or warm
up to the ambient temperature.
Summary of Contents for 44-0 B
Page 12: ...1 8 EB 2626 1 EN Safety instructions and measures...
Page 24: ...3 10 EB 2626 1 EN Design and principle of operation...
Page 36: ...7 2 EB 2626 1 EN Operation...
Page 40: ...8 4 EB 2626 1 EN Malfunctions...
Page 50: ...11 2 EB 2626 1 EN Removal...
Page 52: ...12 2 EB 2626 1 EN Repairs...
Page 54: ...13 2 EB 2626 1 EN Disposal...
Page 56: ...14 2 EB 2626 1 EN Certificates 1...
Page 57: ...EB 2626 1 EN 14 3 Certificates...
Page 58: ...14 4 EB 2626 1 EN Certificates 2 3...
Page 62: ...15 4 EB 2626 1 EN Annex...
Page 63: ......
Page 64: ......
Page 65: ......