24
EB 2522 EN
Mounting and start-up
The pressure gauge (Fig. 5) installed on the
upstream side on site allows the adjusted set
point to be monitored.
Summary of Contents for 2406
Page 31: ...EB 2522 EN 31...
24
EB 2522 EN
Mounting and start-up
The pressure gauge (Fig. 5) installed on the
upstream side on site allows the adjusted set
point to be monitored.
Page 31: ...EB 2522 EN 31...