Index revision : B - September 2020
29
7133
6. Maintenance
WARNING : Switch off the power supply to the Inocontroller or Inobox before connecting the
projector. Before disconnecting the projector, switch off, disconnect the power supply to the
Inocontroller or Inobox (otherwise, a malfunction may occur).
6.1. Summary table of maintenance operations
The dirt and wear of the Inogun A projector caused by the passage of powder depends on the
nature of the powder and the operating conditions.
Therefore, the frequency of the interview indicated in the procedures below is only indicative.
As the
SAMES KREMLIN
equipment is used, the user must create his own maintenance pro-
gram.
Procedure
Description
Preven-
tive
Correc-
tive
Dura-
tion
Frequency
A
A1
Cleaning of projector exterior
X
2 mn
8H
A2
Cleaning of electrode support
and deflector
X
2 mn
8H
B
Holding flange maintenance
B1
Replacement of air nipple
X
2 mn
-
B2
Replacement of o-ring
X
2 mn
-
C
Rear body maintenance
C1
Replacement
X
5 mm
-
D
Gun assembly maintenance
D1
Powder tube
X
2 mn
-
D2
Protective cover assembly
X
2 mn
-
D3
Replacement of HVU
X
5 mn
-