Commissioning
582108110-EN-indG-Pompe Azur-52C225.docxx
59
11
Commissioning
Pump
The pumps are tested in our workshops with lubricant.
Prior to start-up, this lubricant must be removed by rinsing with a suitable
solvent.
At the end of the day, rinse with a suitable solvent.
It is advisable to stop the fluid section in the "low inversion" position in
order to prevent the product from catching on the piston rod.
Motor
Engines are tested before shipping.
Nevertheless, before coupling the motor to a pump, it is necessary to
operate it under vacuum at a pressure of 1 bar / 14.5 psi maximum for
a few minutes.
Summary of Contents for AZUR 52C225
Page 41: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 41 8 Equipment plans Pump 52C225...
Page 42: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 42 Wall mounted pump...
Page 43: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 43 Pump 52C225 Cart...
Page 44: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 44 Pump 52C225 Cart Hopper...
Page 45: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 45 Fluid section C225...
Page 46: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 46 Motor 7000 Stroke 120...
Page 47: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 47 Air supply...
Page 48: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 48 Filter...
Page 49: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 49 Pump priming kit...
Page 50: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 50 Hopper...
Page 167: ...Pneumatic Wiring 582108110 EN indG Pompe Azur 52C225 docx 167 Indirect air control...
Page 214: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 214...
Page 215: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 215...