Operations Dismantling / Reassembling the C225 Fluid section
582108110-EN-indG-Pompe Azur-52C225.docx
196
When changing the seal 909420311 (between flange)
Extract the seal with a flat screwdriver.
Then replace a new gasket and grease the gasket on the
contour more evenly.
Manually remove the product cylinder.
To take off the cylinder:
type in the mallet presence painting)
Using the vice, and tightening the clamp vertically:
Unscrew the 4 tie rods with a 19 mm wrench.
Reassembly
Attention
Vertical winding - attention tightening torque
When coupling the motor with the fluid section:
place the nuts on the tie rods without tightening
them.
Beat the vacuum pump (0,5 bar 7.25 psi max) (5 ways).
Tighten the nuts diagonally to a torque of 100 N.m.
Tools needed
19
19
Summary of Contents for AZUR 52C225
Page 41: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 41 8 Equipment plans Pump 52C225...
Page 42: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 42 Wall mounted pump...
Page 43: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 43 Pump 52C225 Cart...
Page 44: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 44 Pump 52C225 Cart Hopper...
Page 45: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 45 Fluid section C225...
Page 46: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 46 Motor 7000 Stroke 120...
Page 47: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 47 Air supply...
Page 48: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 48 Filter...
Page 49: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 49 Pump priming kit...
Page 50: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 50 Hopper...
Page 167: ...Pneumatic Wiring 582108110 EN indG Pompe Azur 52C225 docx 167 Indirect air control...
Page 214: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 214...
Page 215: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 215...