Disassembly/Re-assembly of the 7000 motor
582108110-EN-indG-Pompe Azur-52C225.docx
163
Put the fluid section back in place, by manually screwing
the 4 M16 nuts in contact.
Coupling to the fluid section.
Connecting the Air supply.
Run the pump slowly at no load for 3 cycles to align the
pump seals vertically.
Tighten the four nuts in star, to the torque of 100 N.m.
Outillage nécessaire
24
Summary of Contents for AZUR 52C225
Page 41: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 41 8 Equipment plans Pump 52C225...
Page 42: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 42 Wall mounted pump...
Page 43: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 43 Pump 52C225 Cart...
Page 44: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 44 Pump 52C225 Cart Hopper...
Page 45: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 45 Fluid section C225...
Page 46: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 46 Motor 7000 Stroke 120...
Page 47: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 47 Air supply...
Page 48: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 48 Filter...
Page 49: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 49 Pump priming kit...
Page 50: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 50 Hopper...
Page 167: ...Pneumatic Wiring 582108110 EN indG Pompe Azur 52C225 docx 167 Indirect air control...
Page 214: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 214...
Page 215: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 215...