
Index revision : A
22
7161
8.3.2. Procedure D2: Replacement of vibrator
Removal
•
Step 1
: Disconnect the vibrator cable on
the Inobox side.
•
Step 2
:
Disconnect the ground wire from
the vibrator.
•
Step 3
Unscrew the 4 vibrator fastening
screws.
Reassembly
•
Step 4
:
Apply a few drops of normal
threadlocker (P/N H2CPAL046) on the 4
fixing screws.
•
Step 5
:
Place the vibrator on the pressure
tank, screw the screws crosswise and in
approach, then tighten to a torque of 10
N.m.
•
Step 6
:
Attach the ground cable lug by
tightening the screw to a torque of 7 N.m.
•
Step 7
:
Reconnect the vibrator cable on
the Inobox side. côté Inobox.
Step 1
Step 3
Step 5
Step 6