SAM Leisure Coventry England
Tel +44 (0)24 7646 1234 Fax +44 (0)24 7646 4433
www.samleisure.co.uk
Fixings Checklist
Bag 1) Base Frame Assembly (D) to Legs (E)
8 Screws Hex.din 933 M-8x20
- To anchor central bar to external frame bars
8 Nuts M-8
8 Washers 0 25x2 8mm
16 Screws Hex.din 933 M-10x25 -
To anchor leg to base frame
16 Nuts M-10
16 Washers 30x3
Bag 2) Apron Assembly (F)
16 Screws 7976 R/CH6’ 3x40 -
To attach aprons to legs
16 Washers 30x3
8 Screws 7976 R/CH 0 6’ 3x13 -
To anchor bracket support
16 Short Screws
Bag 3) Slate Assembly (C)
14 Screw Thread Bar M-8x60 ZN -
To anchor slate to base frame
14 Nuts 22x8 ZN
14 Washers 30x3
14 Nuts M-8
8 Screws M-8x90 -
To level slate
20 Screws M-8x30
22 Levelling Caps 22x6
Bag 4) Rail apron Assembly & Ball Storage Rack (B)
24 Screws Alom/04x13 –
To attach vertical corner to apron
2 Screws M-6 –
Storage Rack
18 Screws 06’ 3x16 –
To anchor apron
Bag 5) Rail Assembly (A)
24 Screws R/Ch 06’ 3x14 –
To anchor corner to profile
10 Screws 03x14 Din 7983 –
To anchor pocket
10 Screws 03’5x19
6 Screws 03’2x23
Bag 6) Rail Set(A), Aprons (B) Anchoring to Slates (C)
24 Screws Hex Din M-10x70
24 Nuts M-10
24 Washers 21x2 Din 127
24 Lock Washers 10 Din 127