background image

 

 

SAM Leisure Coventry England 

Tel +44 (0)24 7646 1234 Fax +44 (0)24 7646 4433 

[email protected]

  

www.samleisure.co.uk

 

 
 

5) Level Slates 

Start  at  the  high  point  created  earlier  (after  levelling  frame)  on  first  slate.  Screw  the 
platform level up to touch the slate. Bring the other 3 platform washers up to each corner 
of  this  slate  with  the  levelling  bolts.  Mark  4  points  on  the  slate  and  check  the  level  at 
these same points throughout the process, with an engineering level.  When level, fit nut 
and washer to each of the pull down bolts and tighten gently. 
Tighten  locking  nuts  on  levelling  bolts  up  to  the  frame.  The  level  and  position  of  the 
highest slate is now fixed. 
Bring  middle  slate  up  to  height  and  level  as  before  using  platform  washers.  Tighten  up 
locking nuts and fit/tighten pull down bolt nuts. 
Repeat with final slate. Double check all levels. Screw all levelling bolts up to touch the 
slate and tighten locking nuts. If any adjustments are required, always loosen pull down 
bolts  first  and  screw  levelling  bolts  slowly,  ¼  turn  at  a  time.  Never  make  adjustments 
without  slackening  pull  down  bolts.  Large  adjustments  made  without  loosening  pull 
down bolts may result in cracked slates. 
When overall level is achieved check all nuts and tighten up to slate. 
Fill joints between slates. This can be done with plaster of Paris and very lightly sanded 
or scraped  gently  with  a  filling  knife when  dry.  Alternatively, use  beeswax/sealing  wax 
and trim with a blade when set. 
Check the pocket entry area of the slates. Lightly sand the pocket mouth if necessary, to 
ensure it is rounded and smooth. Smoother pocket entry reduces cloth wear on pocket lip. 
 

6) Fit Bedcloth 

Lay  cloth  over  slate  bed  and  staple  at  one  end  to  the  tacking  strip.  Stretch  evenly  to 
opposite end and staple/tack. Stretch gently on one side and secure. Stretch and secure on 
final side. Nick and trim pockets. Make a few cuts on the excess cloth to help relieve the 
tension  when  forming  the  pockets.  On  inside  of  pocket  curve  take  a  strip  of  excess 
matching  cloth,  invert  and  staple  to  tacking  strip.  Allow  cloth  to  drop  down,  thus 
concealing all staples.  
 

7) Fit Top Frame  

Cut  cloth  at  24  holes  to  receive  top  frame  bolts.Fit  blinds  (panels)  and  blind  corner 
sections  to  top  frame. 

(If  top  frame  has  been  supplied  disassembled  -  Lay  all  cushions 

upside  down  on  a  protective  surface.  Fit  pocket  plates  to  cushions.  Fit  blinds  and 
corners). 

Each rail has 4 bolts. These align with the 24 holes in the bed/cloth. Screw the 

bolts  into  the  top  frame  finger  tight,  then  unscrew  2  turns.  Lift  top  frame  onto  bed  and 
locate  bolts  through  the  slate.  Fit  washer  and  nut  loosely  onto  each  bolt.  Re  check  all 
levels. When satisfied, tighten all top frame nuts to secure the top.  
 

8) Accessories & Cloth Marking 

Fit ball storage rack under top frame & fit bridge holder & triangle rack. 
Place a mark/spot at the intersection of imaginary end pocket to centre pocket lines.  
Unwrap racking cues, scuff tips to remove rough edges and prepare tips to take chalk. 
Place cues in rack, bridge (if supplied) & triangle/diamond in holder, chalk close to table. 

Reviews: