Installation - Pairing with Wiring Centre
Wiring
Centre
Checklist
1
The Zigbee coordinator must be in pairing mode.
2
Ensure the wiring centre and optional system receiver
(Configured to RX1) for remote boiler switch are powered up.
Note: The wiring centre and system receivers will automatically join
Zigbee network when powered up and the Zigbee coordinator is in pair
mode. Red LED on Wiring Centre and RX1 will go steady when the
devices have joined the Zigbee network.
3
If more than one wiring centre is in the system, establish and note the wiring
centre number by pressing the network key for 1 second. The wiring centre
number will flash.
VS20WRF and VS20BRF Installer Manual
33
PAIRING WITH W
C
iT600 VS20W - Installer - User Manual 011_Layout 1 07.07.2014 10:36 Stron