background image

SALSBURY INDUSTRIES

 

18300 Central Avenue, Carson, CA 90746-4008

Phone: 1-800-562-5377 

 Int’l Phone: 323-846-6700 

Fax: 1-800-562-5399 

  Int’l Fax:  323-846-6800 

         www.lockers.com  

 engineering

@

lockers.com

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability. 

Copyright © 

2020

 Salsbury Industries.  All rights reserved.  (Rev. 08, 7/2/15)   Page 2 of 8 

Locker Options – 77000 Series 

Installation Instructions 

 

Lockers Installation Order with Fillers 

Generally,  the  installation  of  lockers  should  start  with  the  corners 
where locker rows come together at a right angle.  After installing the 
top  corner  fillers,  build  the  rows  outward  from  the  corners 
incorporating  gaps  and  front  vertical  fillers  where  needed.    Lastly, 
install the top in-line fillers.  Locker fillers may be cut to special sizes 
for custom installations. 

Top Fillers – Corners 

Top corner fillers are used where two (2) lockers come together in a 
right angle in a corner.  The flat top corner filler and the sloping hood 
corner  filler  attach  in  the  same  manner.    After  aligning  the  two  (2) 
lockers, place the corner filler on the top of the lockers as shown in 
the  illustration.    Attach  the  fillers  with  six  (6)  #8  TEK  self-drilling 
screws through the existing holes in the top corner filler. 

Front Fillers - Vertical 

Vertical front fillers are used where a gap occurs in the row of in-line 
lockers.  The vertical front filler attaches in the same manner in both 
the flat top lockers and the sloping hood lockers.  Cut the wide front 
filler panel to the appropriate width, if necessary, for the size of the 
gap between lockers.  Align the front filler panel against the side of 
one locker at the front vertical corner and the angle slip joint against 

the side of the other locker at its front vertical corner.  Attach each of 
the two (2) pieces with #8 TEK self-drilling screws through the holes 
provided in the vertical front filler pieces.  One of the two lockers is 
then moved into place while guiding the vertical edge of the wide filler 
panel into the angle slip joint  

Summary of Contents for 77000 Series

Page 1: ...items are separate options and may or may not be included with your order Name Plates The name plates are installed with two 2 4 slot less screws and nuts Sloping Hoods The sloping hoods are assemble...

Page 2: ...illers are used where two 2 lockers come together in a right angle in a corner The flat top corner filler and the sloping hood corner filler attach in the same manner After aligning the two 2 lockers...

Page 3: ...illers have been installed The in line flat top filler and the in line sloping hood filler attach in the same manner After installing the vertical front filler pieces place the in line top fillers on...

Page 4: ...the side of the locker aligning its top edge with the top of the locker and with the two end flanges facing the locker Position the notched corners at the front of the locker Drill 1 4 diameter holes...

Page 5: ...on liability Copyright 2020 Salsbury Industries All rights reserved Rev 08 7 2 15 Page 5 of 8 Locker Options 77000 Series Installation Instructions Additional Shelves Additional shelves are installed...

Page 6: ...ns depicted on the templates Step 2 Attach Anchors and Drill Concrete Screw Holes Remove the templates Attach two anchoring brackets that are 4 shorter than depth of locker underneath the bottom shelf...

Page 7: ...nchor and Drill Concrete Screw Holes Remove the template Attach an anchoring bracket that is 4 shorter than depth of locker underneath the bottom shelf of the left locker by placing two 2 8 x 1 2 long...

Page 8: ...the floor Connect the end splice pieces using 10 24 x 3 8 long slot less screws and 10 nuts provided Complete the installation by attaching the channels to the floor and the end splice pieces to the w...

Reviews: