23
•
The corresponding documentation is supplied with each
option. Read it before starting installation.
Installation.
•
Remove the protective cover from the device’s slot.
•
Take the corresponding electronic unit and insert it into the
reserved slot. make sure that it is properly connected, for
which it is necessary to overcome the resistance caused in
the connector located in the slot.
•
make the necessary connections in the terminal block or
connectors available according to each case.
•
Fit the new protective cover supplied with the interface to
relays card and secure it with the screws from the old cover.
•
For more information, contact our
T.S.S.
or our nearest
distributor.
5.2.11. protection against voltage spikes for the modem /
adsl / fax, etc., line. .
•
The communications line -Com- constitutes a very
low voltage safety circuit. To preserve the quality
must be installed separately from other lines carrying
dangerous voltages (power distribution line).
•
Connect the main line for the modem / AdSL / fax, etc., to
the RJ45 connector of the device, identified as ‘Input’.
•
Connect the modem / AdSL / fax, etc., to the RJ45 connector
of the device, identified as ‘output’.
5.2.12. software.
•
download of free ViewPower software.
viewpower is a UpS monitoring software which provides a
user-friendly interface for monitoring and control. It features
an auto shutdown function for systems consisting of several
pCs in case of power failure. The software enables users to
monitor and control any UpS in the same LAn through an
RS232 or USb communications port, regardless of how far
away they are from each other.
Fig. 20.
View of ViewPower’s main screen.
•
Installation procedure:
go to the web page:
http://support.salicru.com
Select the required operating system and follow the
instructions described on the web page to download
the software.
5.2.13. Considerations before start-up with connected loads.
•
It is recommended to charge the batteries for at
least 12 hours before using the UpS for the first time.
For this, it will be necessary to supply voltage to the
device and turn the circuit breaker at the back to ‘on’.
The battery charger will work automatically.
For the battery modules.
For the models with batteries external to the device or
backup extension modules, it will also be necessary to
turn the fuse or circuit breaker of the batteries arranged
between each one to ‘on’.
•
Although the device can operate correctly without charging
the batteries for the specified 12 hours, the risk of a
prolonged power cut during the first hours of operation and
the UpS’s available backup time should be assessed.
•
do not start up the device and loads completely until
when it is done, however, it should be carried out gradually
to avoid possible difficulties, if not at the first start-up.
•
If, in addition to the more sensitive loads, it is necessary
to connect high-consumption inductive loads, such as for
laser printers or CRT monitors, the starting up of these
peripherals will need to be taken into account to prevent
the device from crashing.
For this type of load considered non-pRIoRITy, a group
of programmable terminals is available depending on the
model. depending on the programming of these, the power
supply may or may not be affected in the event of mains
failure.
SLC TWIN RT2
UnInTeRRUpTIbLe poweR SUppLy SySTemS (UpS)
USER MANUAL