06-2011
Page 31
Salford Farm Machinery Ltd.
2011 699-40' Disc Cultivator Assembly and Parts Manual
1
4
9
6
7
8
5
14
13
3
10
11
12
2
1) FOR 4" x 6" BEAM
2) FOR 3" x 6" BEAM
3) FOR 2 1/2" BEAM
9"
23 cm
10 1/4"
26 cm
7"
18 cm
11
12
10
Shank head assembly is preassembled at the factory. See shank head parts
drawing for replacement parts for shank head.
1. Insert shank leaf (5) into shank head. Retain leaf with 5/8" x 2" carriage bolt (6)
and 5/8" crimp nut (7). Place 3/8" x 1 3/4" x 1 3/4" u-bolt (8) over leaf and tighten
with 3/8" lock nuts (9).
2. Attach sweep (10, 11, or 12) to front of shank with 7/16" x 1 1/2" plow bolts (13)
and 7/16" heavy hex nuts (14).
3. Mount shanks on frame using 5/8" u-bolt(1, 2, or 3) and 5/8" lock nuts (4). See
shank layout drawing for shank mounting locations.
ITEM
QTY
PART NO.
DESCRIPTION
1
2
BU1061
U-BOLT 5/8" x 6" x 5 1/2"
2
2
BU1062
U-BOLT 5/8" x 6" x 4 1/2"
3
2
BU1025
U-BOLT 5/8" x 2 1/2" x 4"
4
4
BN10L
5/8" NYLOCK NUT NC
5
1
CT5261
FORGED C-SHANK EDGE BENT LEAF 3/4 X 1 3/4"
6
1
BC1020H 5/8"NC x 2" LG. CARRIAGE BOLT
7
1
BN10S
5/8" NC STOVER LOCK NUT
8
1
BU0617
3/8 X 1 3/4 X 1 3/4" U-BOLT
9
2
BN06S
3/8"-16NC STOVER LOCK NUT
10
1
CT5074
7" SWEEP
11
1
CT5094
9" SWEEP
12
1
CT5107
10 1/4" SWEEP x 7.5 mm THICK
13
2
BP0715
7/16"NC x 1 1/2" PLOW BOLT
14
2
BN07H
7/16"NC HEAVY HEX NUT
Shank Assembly and Parts