5. INSTALATION
5.1. RECEPTION OF GOODS
Each device is thoroughly checked before transportation. While receiving goods it is recommended to check whether devices were not damaged
during transportation. If a damage to the device is noticed, immediately address the representatives of a transport company. Please inform a rep-
resentative of the manufacturer, if any deviation from the order is noticed.
5.2. TRANSPORTATION AND STORAGE
• All units are packed in the factory to withstand regular conditions of transportation.
• Upon unpacking, check the unit for any damages caused during transportation. It is forbidden to install damaged units!!!
• The package is only for protection purpose!
• While unloading and storing the units, use suitable lifting equipment to avoid damages and injuries. Do not lift units by holding on power supply
cables, connection boxes, air extract or exhaust flanges. Avoid hits and shock overloads. Before installation units must be stored in a dry room
with the relative air humidity not exceeding 70% (at +20 °C) and with the average ambient temperature ranging b5 °C and +30 °C. The
place of storage must be protected against dirt and water.
• The units must be transported to the storage or installation site using forklifts.
• The storage is not recommended for a period longer than one year. In case of storage longer than one year, before the installation it is necessary
to verify whether the bearings of fans and motor rotate easily (turn the impeller by hand) and if the electric circuit insulation is not damaged or
the moisture is accumulated.
Figure 5.2.1. Lifting with forklift.
Only a product placed on a pallet may be lifted in order to prevent damage to the casing.
5.3. UNPACKING
Accessories may be packed together with the product. Prior to transporting the unit, first unpack the accessories.
• Remove the film from the unit.
• Remove the bracing packaging tape which keeps the protective profiles.
• Remove the protective profiles.
•After unpacking the unit, examine it to make sure that it it has not been damaged during transportation. The installation of damaged units is
prohibited!
• Verify that all ordered equipment are delivered before starting the installation. Any deviation from the ordered equipment must be reported to the
supplier of products.