background image

AMBERAIR COMPACT RH 

EN 

MOUNTING AND INSTALLATION INSTRUCTION

Summary of Contents for AMBERAIR COMPACT 7 RH E

Page 1: ...AMBERAIR COMPACT RH EN MOUNTING AND INSTALLATION INSTRUCTION...

Page 2: ...7 5 8 1 SYSTEM PROTECTION 17 5 8 2 PRE STARTUP RECOMENDATIONS OF THE UNIT IN THE PRESENCE OF THE ENDUSER 17 6 MAINTENANCE 17 6 1 SAFETY INSTRUCTION 17 6 2 COVER OPENING 17 6 3 FILTERS AND PREFILTER MA...

Page 3: ...ation and air conditioning systems and units SALDA world like to inform you that based on the Commission Regulation EU No 1253 2014 for enforcing directive 2009 125 EC hereinafter referred to as ErP d...

Page 4: ...ng transportation and installation Make sure not to damage the heater when connecting the piping of the water heater For tightening up use a wrench spanner Before starting the equipment make sure that...

Page 5: ...ess and coating options 0 7 mm AluZn 185 0 5 mm Zn polyester painting RAL 7040 0 7 mm AluZn 185 0 5 mm Zn polyester painting RAL 7040 Internal sheet metal thickness and coating options 0 7 mm AluZn 18...

Page 6: ...n special groove 7 panel block aluminium profile 8 panel block gasket Figure 4 1 1 4 AmberAir Compact SD50 cross section 1 Corner profile with thermal break strips 2 intermediate profile with thermal...

Page 7: ...8 3 400 30 43 36 3 400 35 5 54 36 7 RH F1 E3 5 00 8 3 400 51 73 71 3 400 56 5 84 71 7 RH F1 W 5 00 8 3 400 0 8 3 48 1 400 6 3 14 48 7 RH F2 E1 5 80 9 6 3 400 27 39 02 3 400 33 3 51 62 7 RH F2 E2 5 80...

Page 8: ...lter 592 490 46 ePM1 85 Filtras MPL 592x490x46 M5 Panel filter 592 490 46 EePM10 65 Filtras MPL 592x490x46 G4 Panel filter 592 490 46 Coarse 85 50 according to ISO 16890 4 4 OPERATING CONDITIONS PLACE...

Page 9: ...6 11 15 10 14 9 13 20 19 18 17 1 supply air fan 2 supply air fan pressure sensor on control board 3 extract air fan 4 extract air fan pressure sensor on control board 5 supply air filter 6 supply air...

Page 10: ...ers Enthalpy width 200 mm il rot E E20 1900 ZSLROET0007 il rot E E16 1900 ZSLROET0008 il rot E E20 1700 ZSLROET0009 il rot E E16 1700 ZSLROET0010 il rot E E20 1500 ZSLROET0011 il rot E E16 1500 ZSLROE...

Page 11: ...utiklis temp TJ1TE NTC10k3 6x6x22B 2x5 0 m PVC PJUT0069 Temperaturos jutikliui TJ1 NTC10k3B 6x240S 2x2 0mPVC CF PJUT0076 5 INSTALATION 5 1 RECEPTION OF GOODS Each device is thoroughly checked before t...

Page 12: ...ith slings it is necessary to insert spacers between them in order to prevent damage to the casing of the product Figure 5 2 2 AmberAir Compact lifting with slings 5 3 UNPACKING Remove the film from t...

Page 13: ...ed from the pallet with a forklift at the recesses at the supporting base or with slings 5 4 MOUNTING DIAGRAM TV1_P TV1_I T2 TV1_P TV1_I Figure 5 4 1 With automatic TV1_P TV1_I T2 TV1_P TV1_I Figure 5...

Page 14: ...Water heater temperature sensor P on the pipe I into the pipe CW2 Duct Water cooler TV2_P TV2_I Duct Water heater cooler temperature sensor P on the pipe I into the pipe DX2 DX cooler 5 5 MOUNTING In...

Page 15: ...sportation and Storage Note Before conecting sections please remove transportation rubber tapes from rotor wheel Extended rotor section connection 5 5 1 PLACE REQUIREMENTS FOR THE EQUIPMENT AND MOUNTI...

Page 16: ...n fixing Make sure that the fans can not be accessed through air duct heads If it is possible to access the fan protective grid should be installed You can choose it in our website Do not reduce the d...

Page 17: ...twork After installation of the ventilation unit disconnection from the power network is performed through the external protection device and unit main switch The unit must be thoroughly checked again...

Page 18: ...Before starting maintenance or repair work make sure that the unit is disconnected from the electrical network and main switch is turned off Maintenance should be performed only by experienced and tra...

Page 19: ...release the retainers The fan unit is pulled out through the slide rails It is recommended to use a lifting hook for lifting the fan unit from the product Use the provided lifting holes If there is a...

Page 20: ...doors of the product Unscrew the switchboard from the control section Disconnect the connections from the controller Remove the controller To reassemble repeat the actions in the reverse order When co...

Page 21: ...ote control connector BMS connection Date and time settings Manual components control System modes for easy end user control Stand by building protection economy comfort Air flows are used in the syst...

Page 22: ...control Water heater protection thermostat NC Water heater circulation pump control Water heater protection temperature sensor Water cooler 0 10V valve control Water cooler circulation pump control Wa...

Page 23: ...scription of the acquired air handling system 3 Internal components of the device type of heat exchanger plate or rotor integrated dampers sensors and etc see components of the chosen device 4 Control...

Page 24: ...ator NM230A TP ZAKP0055 Damper actuator with spring NFA ZAKP0051 Thermostat T Anti frost spiral TS1C0P ZAKT0009 Thermostat T 20 90 C 16A 250V Thermostat 20 90 C 16A 250V ZAKT0013 Pressure relay PS600B...

Page 25: ...x stogelis Comfort Box roof RCB 1747x967 GNGPR168_1252_0 Water cooler RWC 1753x973 C2 GNGPR168_1239_0 RWC 1753x973 C4 GNGPR168_1253_0 Water cooler mounting legs for bottom chanel LRWC 1753x973 GNGPR16...

Page 26: ...7x967 L HW1 CDX2 DE GSIASD0108 CB 1747x967 L HW1 CDX4 DE GSIASD0109 CB 1747x967 L HW2 CW2 DE GSIASD0110 CB 1747x967 L HW2 CW4 DE GSIASD0111 CB 1747x967 L HW2 CDX2 DE GSIASD0112 CB 1747x967 L HW2 CDX4...

Page 27: ...onnection 7 E1 E2 E3 C2 Electrical connection when E3 heater and C2 control SP90 E3 elektrical heater 51kW 7 IVS F1 F2 F3 Extract air fan F1 F2 F3 TE and TL SP92 Duct electrical heater 126kW 7 IVS F4...

Page 28: ...L3 N PE POWER SUPPLY 3 400V 50Hz Xp1 PE 230 MAIN SWITCH 55 1 N 62 62 230 Q1 1 2 3 4 5 6 7 8 55 SAF Fan Q3 L1 Heater Q5 L1 Heater Q6 L1 EAF Fan Q4 L1 Control Q2 2 L1 Heater Q5 L2 Heater Q6 L2 Heater Q...

Page 29: ...3 400V 50Hz Xp1 PE 230 2 MAIN SWITCH 55 1 N 62 62 230 2 Q1 1 2 3 4 5 6 7 8 55 SAF Fan Q3 L1 Heater Q5 L1 Heater Q6 L1 EAF Fan Q4 L1 Control Q2 2 L1 Heater Q5 L2 Heater Q6 L2 Heater Q5 L3 Heater Q6 L3...

Page 30: ...SUPPLY 3 400V 50Hz Xp1 PE 02 1 MAIN SWITCH 55 1 N 62 62 02 1 Q1 1 2 3 4 5 6 7 8 55 SAF Fan Q3 L1 Heater Q5 L1 Heater Q6 L1 EAF Fan Q4 L1 Control Q2 2 L1 Heater Q5 L2 Heater Q6 L2 Heater Q5 L3 Heater Q...

Page 31: ...rminal block Control box Rotor Motor Controller 1 2 3 1 2 3 10 8 9 1 2 L N PE 0 10V GND RL_C RL_NC RL_NO OJ DRHX M3 L1 R 1 2 N 1 2 PE 1 2 31 1 2 32 1 2 33 1 2 34 1 2 AHU 1 41 2 1 40 2 1 39 2 1 38 2 1...

Page 32: ...r temp sensor 1 2 3 4 5 6 X102 769 112 7 8 9 10 11 12 W19 white W19 brown W18 white W18 brown ODA EHA TL TE Extract air fan 1 1 2 3 4 5 6 1 480704 0 X35 Extract air fan 1 1 2 3 4 5 6 X101 769 112 7 8...

Page 33: ...A EHA TL TE Extract air fan 1 Extract air fan 1 1 2 3 4 5 6 EX2 EHA X101 769 112 7 8 9 10 11 12 1 2 3 4 5 6 1 480704 0 X33 2 1 2 3 4 5 6 1 480704 0 X33 1 Extract air fan 2 1 2 3 4 5 6 1 480704 0 X35 1...

Page 34: ...BY SIGNATURE DUTIES NAME DATE SALDA UAB Drawing Book APPROVED BY Revision 1 2 3 4 5 6 7 8 9 10 7RH 7 IVS PS 1X Principal connection scheme 1 11 2018 06 14 2018 06 14 0 PS1 1 COM 2 NO 3 NC X102 3 X102...

Page 35: ...SALDA UAB Drawing Book APPROVED BY Revision 1 2 3 4 5 6 7 8 9 10 7RH 7 IVS PS 2X Principal connection scheme 1 09 2018 06 14 2018 06 14 0 PS1 2 1 COM 2 NO 3 NC X102 3 X102 4 PS1 1 1 COM 2 NO 3 NC X10...

Page 36: ...11 12 W14 white W14 red W14 green SUP ETA W15 brown W15 white U RH TA GN YE RD WH GND RH 5V TA DTJ TR1 1 2 3 4 5 6 X100 769 112 7 8 9 10 11 12 W16 gr ye W16 gr ye W16 grey W16 brown W16 black W14 red...

Page 37: ...6 1 480704 0 X32 2 1 2 3 4 5 6 1 480704 0 X34 1 1 2 3 4 5 6 1 480704 0 X34 2 W6 gr ye W7 black W6 black W7 brown W6 brown W7 grey W6 grey W7 gr ye W7 gr ye W7 grey W7 brown W7 black W6 black W6 brown...

Page 38: ...ical heater 24 SUP 1 2 3 4 5 6 X5 769 112 7 8 9 10 11 12 1 2 3 4 5 6 X30 769 112 7 8 9 10 11 12 1 2 3 4 5 6 X29 769 112 7 8 9 10 11 12 1 2 3 4 5 6 X6 769 112 7 8 9 10 11 12 White 0 5 Black 4 White 0 5...

Page 39: ...Y SIGNATURE DUTIES NAME DATE SALDA UAB Drawing Book APPROVED BY Revision 1 2 3 4 5 6 7 8 9 10 7RH 7 PVS PS 1X Principal connection scheme 1 10 2018 06 14 2018 06 14 0 PS2 1 COM 2 NO 3 NC X103 1 X103 2...

Page 40: ...BY SIGNATURE DUTIES NAME DATE SALDA UAB Drawing Book APPROVED BY Revision 1 2 3 4 5 6 7 8 9 10 7RH 7 PVS T1 Principal connection scheme 1 08 2018 06 14 2018 06 14 0 X103 9 X103 10 1_COM 2_NO 4_NC PE...

Page 41: ...3 4 5 6 X104 769 612 002 000 7 8 9 10 11 12 1 2 3 4 5 6 X104 769 112 7 8 9 10 11 12 156 153 150 135 132 147 144 141 138 123 121 119 117 115 113 129 126 96 99 102 105 108 111 RS 159 Brown 0 75 Green ye...

Page 42: ...2 3 4 5 6 X100 X101 769 112 7 8 9 10 11 12 W3 black W3 gr ye W3 grey W3 brown RS 1 2 3 4 5 6 X102 X103 769 112 7 8 9 10 11 12 1 2 3 4 5 6 X102 X103 769 612 002 000 7 8 9 10 11 12 White 0 5 White 0 5...

Page 43: ...3 4 5 6 7 8 9 10 7RH 7 VM 1 18 2018 06 14 2018 06 14 0 11 14 GND E1 24VDC D1 MOEA03K0 PVS IVS W20 grey W20 brown W20 black W20 gr ye PE L1 L2 L3 N MOEA03K0 1 2 3 4 5 6 Power 1 2 3 4 5 6 Control 10VDC...

Page 44: ...L N PE V V PE 28 28 28 32 32 35 35 35 31 34 X15 KF2EDGKD 2 5 3P 3 2 1 87 K1 A1 A2 1 2 02 2 4 K1 41 41 K2 A1 A2 1 2 02 4 4 K2 43 43 43 Q1 1 2 3 4 5 6 7 8 PE PE 7 6 8 B 10 Q2 1 2 3 4 5 5 C 16 Q3 1 2 3 4...

Page 45: ...T 219 1142 219 1142 0 1 2 PS 7 W C2 02 12 10 2018 12 10 2018 12 10 2018 1 25 PS 2 1 26 2 1 27 2 1 28 2 1 29 2 1 30 2 1 PE R 2 1 N 2 1 L1 2 1 31 2 1 32 2 1 33 2 1 34 2 1 35 KV 2 1 36 2 1 37 2 1 38 2 P...

Page 46: ...1 9 2 1 10 2 1 11 2 1 12 2 1 13 TEMP 2 1 14 2 1 15 2 1 16 2 1 17 2 1 18 2 1 19 2 1 20 2 1 21 2 1 22 2 1 23 2 1 24 2 PE L1 L2 L3 24 D1 GND E1 11 14 PV1 PE L1 L2 L3 24 D1 GND E1 11 14 PV2 PE L1 L2 L3 2...

Page 47: ...evision SIGNATURE 1 2 3 4 5 6 7 8 9 10 7RH IVS MODBUS 1X 1 17 0 dariusaleksandravici 2018 06 14 RS SUP EHA ETA ODA 1 2 3 U5 MB MCB U6 1 2 3 SL1 Switch 1 ON 120 Ohm 2 OFF 1 kOhm 3 OFF 1 kOhm J10 J20 J5...

Page 48: ...ATURE 1 2 3 4 5 6 7 8 9 10 7RH IVS MODBUS 2X 1 16 0 dariusaleksandravici 2018 06 14 RS SUP EHA ETA ODA 1 2 3 U5 MB MCB U6 1 2 3 1 2 3 SL1 Switch 1 ON 120 Ohm 2 OFF 1 kOhm 3 OFF 1 kOhm J10 J16 J5 J10 J...

Page 49: ...wing Book APPROVED BY Revision RSD Principal connection scheme 1 01 2018 06 14 2018 06 14 0 M3 1 2 3 1 2 3 10 8 9 1 2 L N PE 0 10V GND RL_C RL_NC RL_NO OJ DRHX 438 436 1 2 3 4 5 6 X51 7 8 9 794715 1 B...

Page 50: ...63 63 57 59 61 1 2 3 4 5 6 X30 769 612 002 000 7 8 9 10 11 12 PE 54 58 57 58 5 9 9 43 34 34 43 49 49 TK2 64 TK1 47 47 60 3 4 3 4 5 EK9 A1 A2 EK8 A1 A2 EK7 A1 A2 K12 1 2 3 4 5 6 17 17 15 15 14 14 11 12...

Page 51: ...3 4 5 6 K1 1 2 3 4 5 6 K1 A1 A2 230VAC 1 2 01 3 4 01 5 6 01 13 14 01 K1 K2 1 2 3 4 5 6 K2 A1 A2 230VAC 1 2 01 3 4 01 5 6 01 K2 STEP 1 3x2000W 3x3000W K3 1 2 3 4 5 6 STEP 3 3x1000W 9x3000W K3 A1 A2 23...

Page 52: ...HEAT1 X26 X17 X14 N7 EKR KN3 NIS X25 COM X24 K1 X22 K2 X20 K3 X18 K4 X8 X10 X5 X6 X3 0 10V X4 GND N7 EKR KN3 NIS K11 1 2 3 4 5 6 2 2 7 7 1 8 8 53 53 52 52 51 51 K11 A1 A2 230VAC DO8 N 12VDC DI AT 63...

Page 53: ...HEAT1 X26 X17 X14 N7 EKR KN3 NIS X25 COM X24 K1 X22 K2 X20 K3 X18 K4 X8 X10 X5 X6 X3 0 10V X4 GND N7 EKR KN3 NIS K11 1 2 3 4 5 6 2 2 7 7 1 8 8 53 53 52 52 51 51 K11 A1 A2 230VAC DO8 N 12VDC DI AT 63 6...

Page 54: ...4 5 6 K1 1 2 3 4 5 6 K1 A1 A2 230VAC 1 2 01 3 4 01 5 6 01 13 14 01 K1 K2 1 2 3 4 5 6 K2 A1 A2 230VAC 1 2 01 3 4 01 5 6 01 K2 STEP 1 6x2000W K3 1 2 3 4 5 6 STEP 3 3x1000W 6x2000W K3 A1 A2 230VAC 1 2 01...

Page 55: ...2 1 2 3 4 5 6 K2 A1 A2 230VAC 1 2 01 3 4 01 5 6 01 K2 34 34 36 36 38 38 35 35 33 33 37 37 31 32 31 32 STEP 1 3x3000W K3 1 2 3 4 5 6 47 41 44 44 48 48 45 45 42 42 41 47 40 39 40 39 STEP 3 3x1000W 6x200...

Page 56: ...5 6 K2 A1 A2 230VAC 1 2 01 3 4 01 5 6 01 K2 31 31 33 33 35 35 32 32 30 30 34 34 28 29 28 29 STEP 1 3x3000W K3 1 2 3 4 5 6 42 38 40 40 44 44 41 41 39 39 38 42 37 36 37 36 STEP 3 3x1000W 6x2000W K3 A1 A...

Page 57: ...V1 0 230V ON OFF Spring back L supply N A1 230V ON OFF Spring back L supply N A2 X23 1 DI9 X23 2 12VDC X23 3 DI10 X23 4 12VDC N2 EX1 V1 0 K5 NC NO COM K7 NC NO COM K6 NC NO COM K8 NC NO COM X35 1 PE X...

Page 58: ...DO4 NC X11 5 DO4 NO X11 6 DO4 COM X14 1 DI5 12VDC IN GND X14 2 DI5 12VDC OUT TACHO IN X14 3 DI6 12VDC IN GND X14 4 DI6 12VDC OUT TACHO IN X14 5 DI7 12VDC IN GND X14 6 DI7 12VDC OUT TACHO IN X14 7 DI8...

Page 59: ...X12 5 DO2 NO X12 6 DO2 COM N5 EMRex V4 6 Water cooler circulation pump fail Water cooler 0 10V control Water cooler ret fluid temperature sensor Water cooler power line TV3_P TV3_I TK M M10 Q1 1 2 3...

Page 60: ...15 2018 06 15 FPP NC NO COM FA NC NO COM Jumper Jumper wired by manufacturer Jumper 24VDC max 50mA 1 2W 24VDC max 50mA 1 2W START STOP CB UC CB UC CB UC X4 1 DI4 X4 2 12VDC N1 MCB V1 0 X22 7 DI8 X22...

Page 61: ...NC Electrical heater 0 10V control Electrical heater power line L1 1 230V N AHU Controll circuit CB HE 1 X1 1 2 2 1 2 3 1 2 4 1 2 5 1 2 6 1 2 AT1 AT2 RT1 RT2 0 10V GND N 1 2 L1 1 2 N L Electrical hea...

Page 62: ...2 GND X2 3 AO2 X2 4 GND X2 5 AO3 X2 6 GND X4 1 AI1 X4 2 GND X4 3 AI2 X4 4 GND X4 5 AI3 X4 6 GND X12 1 DO3 NC X12 2 DO3 NO X12 3 DO3 COM X12 4 DO2 NC X12 5 DO2 NO X12 6 DO2 COM N5 EMRex V4 6 Water hea...

Page 63: ...eater circulation pump fail Water heater 0 10V control Water heater ret fluid temperature sensor Water heater power line TV1 TK M Q1 1 2 3 4 K1 1 2 3 4 K1 A1 A2 230VAC 1 2 01 3 4 01 K1 N L1 PE 0 10 VD...

Page 64: ...ater automatic protection NC Outdoor air preheater control output 0 10VDC Outdoor air preheater power line control AHU Controll circuit PE Electrical preheater manual protection NC X21 1 DI1 X21 2 12V...

Page 65: ...5 6 7 7 EI J Balsys EI D Aleksandravi ius Aut T 219 1193 219 1193 0 1 2 PS 7 N C2 02 2018 12 13 2018 12 13 2018 12 13 1 25 PS 2 1 26 2 1 27 2 1 28 2 1 29 2 1 30 2 1 PE R 2 1 N 2 1 L1 2 1 31 2 1 32 2...

Page 66: ...GND RH 5V TA DTJ Afte rotor air temperature sensor Extraxt air humidity and temperature sensor Control Box AHU Figure 8 1 4 38 7 N C2 The jumpers are installed by the manufacturer see on the automati...

Page 67: ...r duct system Check the tightness Clean Dampers diffusers grid Check the tightness of connections Clean Switching unit contactor Every 3 to 4 months visually assess the functioning of the switch ing u...

Page 68: ...reduction LST EN 60204 1 2006 Safety of machinery Electrical equipment of machines Part 1 General requirements LST EN 60335 1 2012 Household and similar electrical appliances Safety Part 1 General re...

Page 69: ...er the equipment to manufacturer Delivery costs should be covered by customer Manufacturer reserves the right to change this technical passport any time without prior notice if some typographic errors...

Page 70: ...70 AMBERAIR COMPACT RH v2019 08...

Page 71: ...71 AMBERAIR COMPACT RH v2019 08...

Page 72: ...000198 UNIT S MAINTENANCE TABLE Product name LOT number Instalation Interval Date Fan cleaning Once a year Heat exchanger cleaning Once a year Filter replacement Every 3 4 months Look at the product l...

Reviews: