4. Environment / waste glass / health issues 

VISION-LITE® (II) coated glass products can be disposed of as per clear float glass.
Edge working residues have to be continuously and completely collected during the grinding process. 
These residues must be further treated in compliance with national legislation about industrial wastes. 
In some legislation, residues from grinding process have to be treated as toxic wastes.
As for any dust coming from the grinding process, any inhalation or skin contact of these residues must 
be avoided.
On request, a Safety Use Instruction Sheet (SUIS) relating to the ECDirective 91/155/EEC can be supplied.

5. Glazing instructions

The selection of a suitable and practical glazing method depends on a variety of factors such as the size 
of the glass, the exposure and the type of framing material and system.
Glazing and fixing techniques must comply with the recommendations of the relevant national standards. 
Glazing blocks, frame size and maximum frame deflection for double-glazed units are not specific to 
VISION-LITE® range glass products.

6. Protection, cleaning and maintenance of the end 
products

As for other glass products, it is important with VISION-LITE® range glass products to respect the 
following:
• 

In order to avoid damaging the glass with aggressive contaminants from site-works (e.g. paint, 
plaster, mortar…), it is recommended that glazings are installed after all other work on site has 
been completed. In case this cannot be respected, efficient protection of the glazing, by means of 
polyethylene film for instance, must be put in place;

• 

Minimise, as far as possible, the amount of time that the glass is stored on site prior to installation;

• 

Follow the usual recommendations: store in a dry, well ventilated location, protected from adverse 
weather conditions and variations in temperature and humidity;

• 

Avoid splashes of concrete, plaster, mortar residues as much as possible. To prevent a chemical attack 
on the glass, such substances must be removed from the glass immediately. It is recommended that 
the glass is cleaned as soon as it is installed.

• 

Glazing and fixing techniques must comply with the recommendations of the relevant national 
standards. Glazing blocks, frame size and maximum frame deflection for doubleglazed units are not 
specific to VISION-LITE® range glass products.

6.1. PROTECTION OF THE GLAZING DURING BUILDING WORKS

• 

Use of semi-permanent stickers (1-3 months) with vinyl frontal and acrylic adhesive is possible. This 
kind of label represents main part of the label market. Label should not let residues or at minimum 
residues easy to remove with water or with isopropanol.

• 

The identification labels on the glass sheets must be removed before or immediately after installation. 
Do not use sharp/metallic tools for this purpose.

• 

To indicate the presence of the glass sheet, do not use materials such as lime, chalk or soap on 

6.2. REMOVAL OF LABELS AND MARKINGS

Summary of Contents for VISION-LITE

Page 1: ...VISION LITE VISION LITE II PROCESSING GUIDELINES MAY 2022 1 PROCESSING GUIDELINES VISION LITE VISION LITE II...

Page 2: ...VISION LITE VISION LITE II PROCESSING GUIDELINES MAY 2022 2 DOCUMENT CODE DATE SGG QD C GUI 0013 B 05 2022...

Page 3: ...he coating 7 1 5 2 Identification of the coated face 9 2 Transport acceptance storage and handling 9 2 1 Transport 9 2 2 Receipt of the delivery 10 2 3 Storage 11 2 3 1 General 11 2 3 2 Shelf life 11...

Page 4: ...of Insulating Glass Units 17 3 13 Processing quality checks 18 4 Environment waste glass health issues 19 5 Glazing instructions 19 6 Protection cleaning and maintenance of the end products 20 6 1 Pr...

Page 5: ...can be used in single or double glazing unit VISION LITE is mainly used in retail shops and museums as display case glazing and in exteriors as shop windows or balustrades VISION LITE can also be use...

Page 6: ...from this norm Uniformity defect slight visible variation in colour in reflection or in transmission within a coated glass pane or from pane to pane Stain defect in the coating larger than punctual de...

Page 7: ...effect it must be also present on face 2 of the pane This coated glass can be laminated taking care to always place the coating outside of the laminate Use of the coating against the PVB is not allow...

Page 8: ...panel can be replaced with a low emissivity coated glass like PLANITHERM XN or ECLAZ for instance The association of Semi VISION LITE with other low emissivity coatings must be assessed case by case p...

Page 9: ...ransported in 2 8 tonnes packs jumbo or split sizes Glass sheets must be transported vertically The individual sheets are packed with the coated side towards the inside of the frame unless otherwise r...

Page 10: ...ed on the identification label All deliveries are identified with a label providing the following data 2 2 RECEIPT OF THE DELIVERY No claim can be accepted for damages caused during and after processi...

Page 11: ...ns with vacuum cups on the coated side cannot be avoided make sure that the vacuum cups are perfectly clean Not all solutions are suitable for cleaning vacuum cups see manufacturer documentation for d...

Page 12: ...other ordinary coated glass However the following recommendations have to be respected Any irregularity or damage of the edges must be avoided since it is likely to increase the risk of breakage durin...

Page 13: ...h 3210 6000 mm PLF the usable surface is 3170 5960 mm VISION LITE range does not need to be edge deleted whatever the configuration of use It could be used with polysulphide polyurethane or silicone I...

Page 14: ...and 8 Brushes Flexible soft clean polyamide bristles Maximum diameter of 0 2 mm 20 40 mm long Make care that all the brushes are perfectly clean and regularly maintained Any hard brushes must be lift...

Page 15: ...utions left on the coating may induce at tempering hot corrosion giving the aspect of pinholes of the coating Such marks may not be washable Also even in case of annealed version there is a risk that...

Page 16: ...lass presence this must be in certain situations used manually in fact the very low reflectance of the VISION LITE II glass may not be detected by the sensor and therefore it may not send the informat...

Page 17: ...LITE II is assembled into double glazed units this should be performed within 2 days SEMI VISION LITE for annealed laminated glass or tempered SEMI VISION LITE II only can be laminated with the coatin...

Page 18: ...etc Visual detection of roller wave Normal control of the toughening quality break pattern etc After heat soak testing Visual aspect control scratches oxidation corrosion splinters etc Check that no d...

Page 19: ...paint plaster mortar it is recommended that glazings are installed after all other work on site has been completed In case this cannot be respected efficient protection of the glazing by means of poly...

Page 20: ...cleaning the coating are isopropanol IPA or ethanol Cleaning with the help of solvents must be immediately followed by normal washing with water and rinsing The owner of the building must ensure the...

Page 21: ...ITE VISION LITE II PROCESSING GUIDELINES MAY 2022 21 SAINT GOBAIN INNOVATIVE MATERIALS POLSKA SP Z O O ODDZIA GLASS ul Szklanych Dom w 1 42 530 D browa G rnicza www saint gobain glass pl bgp saint gob...

Reviews: