PRIME DESIGN, A SAFE FLEET BRAND 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118 ▪ Phone: 651-552-8554 ▪ 1.8.PRIME.RACK ▪ Fax: 651-552-1799 ▪ Email:[email protected] ▪ www.primedesign.net
TM & © 2017 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6092974, 6764268, 6971563, 2364879, 8857689, 8511525, 8991889 AND OTHER PATENTS PENDING
6
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
Flat Washer
Lock Nut
CON-8005
ASSEMBL
Y INSTR
UCTIONS– GEN 1 CONDUIT CARRIER
CONDUIT CARRIER
MOUNTINGS
3.1
3.2
M8 X 70MM Bolts
CROSSBAR PREPARATION-FRONT
Find the center of the top of Front Crossbar between the inner
bends. Using a grease pencil, mark the center, then measure
out 3.50” to the left and right of that center mark and mark
again using the grease pencil. The marked distances will
measure 7.00” across as shown below.
2.1
Prior to drilling, mark a center line along the length of the
Crossbar to ensure the holes are correctly centered.
2.2
Drill holes using a
3/8” steel drill bit.
2.3
Must remain loose enough to
position the Conduit Carrier.
3.4
Place Conduit Carrier onto Crossbars, then assemble Conduit
Carrier Mountings on top securing the Conduit Carrier to the
Crossbars using the provided hardware. Do not tighten the
Mountings until Step 3.6.
3.3
Summary of Contents for Prime Design CON-8005
Page 1: ......
Page 11: ...Page Intentionally Left Blank ...
Page 12: ...USAM CON8005 US01 Rev A 0917 ...