
Prime Design Limited Warranty. Seller’s sole and exclusive warranty (and Buyer’s sole and exclusive remedy and Seller’s entire liability for any breach thereof) with respect to the Goods is set forth in the Limited Warranty document available at primedesign.net/warranty-liability
(the “Prime Design Limited Warranty”).
▪
TM & © 2020 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6427889, 6764268, 6971563, 8991889, 9415726, 9506292, 9481313, 9776476, 9796340, 10470565, 10486608 AND OTHER PATENTS PENDING
3
ASH-8033 ASSEMBL
Y
INSTR
UCTIONS
1
M8 x 70MM
GEN2/4 LIGHT HOLDER
INSTALLATION SEQUENCE
NOTE: Ladder Rack is shown for illustrative
purposes only, and is not included with this
Accessory Light Holder Kit.
This Light Holder Kit contains only the parts
needed to repair, replace, or retrofit one
Crossbar. Order an additional kit for the other
Crossbar to add an additional accessory light.
1.2
Place the Light Holder Clamps into the
top groove of the Crossbar, ensuring the
Clamps seat into the Crossbar’s groove.
1.1
Assemble the Light Holder Clamps onto the
Crossbar using the provided hardware shown
below. Do not tighten until Step 1.5.
LIGHT HOLDER INSTALLATION
1.3
Place the Light Holder between the
Clamps, and ensure the Holder fully
engages the Clamp’s top groove.
1.4
Light Holder base must seat
in the Clamp’s upper groove.
Not all Gen2/4 racks will have enough space between
Rotation/Rotation Uppers to fit a Light Holder. Measure
prior to installing to ensure there will be no rotation
Upper interference. A minimum of 10.00” is required
between the inside ends of Rotation/Rotation Uppers.