Safco 5210 Assembly Instructions Manual Download Page 4

Slide the remaining 48" x 18" wire shelf
down over the connected half-sleeves
at the top of the unit. Gently tap all
four corners down with a rubber mallet
to fully seat the shelf.

13

5210-37:  4 of 4;  Rev. 3,  08/00

Safco Products Company,  New Hope, MN 55428

Place one of the  H  47" x 17" Shelf Tops onto the
top 48" x 18" wire shelf. Insert remaining shelf top
diagonally into second shelf area, and lower it into
horizontal position on top of second wire shelf.

15

Adjust levelers at bottoms of all six posts with
levelers until shelves are level in both directions.

TIP:

  Use a carpenters’ level to insure accuracy.

16

Assemble the mobile server shelf. Insert two  P
Swivel Casters into the corner holes on one long
side of the   I   42" x 24" Wire Server Shelf. Insert
the two  O  Swivel/Locking Casters into the
remaining corner holes of the shelf. Place the  J
41" x 23" Shelf Top onto the wire server shelf.
Mobile unit can be stored under LAN Workstation.

17

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

LEVELER

42" x 24" WIRE
SERVER SHELF

41" x 23"
SHELF  TOP

SWIVEL
CASTER

SWIVEL/LOCKING CASTERS

shelf front. Press front two “U” brackets onto lower front
wire on the shelf. Repeat for 2nd keyboard tray. (

HINT:

Position “U” brackets between zig-zag shelf wires)

14

WIRE SHELF

Q

Q

Q

Q

Q

Position one   K  Wire Keyboard Assembly so back two
“U” brackets fit onto the lower wire of the shelf frame at
the back of the shelf. Tilt Wire Keyboard Assembly up to

Q

Q

Q

Q

Q

“U” BRACKET

48" x 18"

WIRE SHELF

HALF-SLEEVES

48" x 18"
SHELF
TOPS

Reviews: